<>70
Equipment has been placed above other equipment and placed on a means of transport.
<>69
The goods/consignments/equipment have been written off and disposed of.
<>34
A damaged piece of equipment has been repaired.
<>87
The goods/consignments/equipment have been sorted erroneously to an incorrect route.
<>40
The goods/consignments/equipment have arrived/are available at port.
<>95
In the leasing of equipment a sub-lease has been notified to the lessor.
<>59
The goods/consignments/equipment previously loaded to a means of transport have been removed from that means of transport before completion of the planned transport.
<>103
Equipment, e.g. a refrigerated container, has been unplugged from the power source at a given location.
<>98
The goods/consignments/equipment have been transferred in from another location.
<>10
Goods/consignments/equipment have been held prior to shipment and are now cleared for shipment following examination by relevant authority.
<>54
The goods/consignments/equipment expected to be located and identified in the transport chain cannot be identified.
<>17
The customs authorities have refused to clear the goods/consignments/equipment.
<>53
The goods/consignments/equipment expected to be picked up and conveyed from location to location in the transport chain have not been picked up.
<>65
Equipment, e.g. a refrigerated container, has been plugged into the power source.
<>38
The freight charges on goods/consignments/equipment have been paid.
<>6
Goods/consignments/equipment or means of transport have been booked for subsequent movements.
<>21
The goods/consignments/equipment have been delivered to a location/party in the transport chain.
<>33
A piece of equipment has been sent out for repair.
<>80
The goods/consignments/equipment have been returned to a location as per instructions.
<>77
The transport action/documentation has been refused without explanation.
<>36
The goods/consignments/equipment notified to be missing have not been located.
<>85
Goods/consignments/equipment expected to be discharged from a means of transport at a specific location have not been discharged.
<>8
Goods/consignments/equipment held for import restriction purposes have been released for import.
<>72
The consignee has given full acknowledgement for the receipt of goods.
<>46
The goods/consignments/equipment have been moved/is available to be moved into bond.
<>93
The goods/consignments/equipment have been loaded into a piece of equipment, e.g. a container.
<>43
The goods/consignments/equipment have been received by one transport operator from another transport operator.
<>96
In the leasing of equipment a sub-lease has been notified by a lessee.
<>48
The goods/consignments/equipment have been loaded onto a means of transport.
<>15
Goods/consignments have been added to other goods/ consignments to form a larger consignment and/or have been incorporated into one or more containers/units.
<>51
The means of transport on which the goods/consignments/equipment was being (was to be) moved has been damaged.
<>89
The equipment, e.g. a container, has been steam cleaned.
<>4
Equipment previously the subject of a 'defective condition' status has been returned to service.
<>23
Delivery of the goods/consignments/equipment has not been completed in accordance with instructions.
<>67
Goods/consignments/equipment have been positioned on a means of transport.
<>3
Goods/consignments/equipment have been received or a means of transport has arrived in a defective condition.
<>24
The means of transport has departed from a location in the transport chain.
<>79
Goods/consignments/equipment have been reloaded onto a means of transport.
<>60
Equipment has been hired out to a hirer/customer.
<>29
The goods/consignments/equipment have been unloaded from a means of transport.
<>74
Goods/consignments/equipment have been received at a location/party in the transport chain.
<>30
The package/equipment has been found to be empty.
<>83
The equipment has been sealed according to operational and governmental requirements.
<>44
The goods/consignments/equipment which were previously sent to a wrong destination are on the way to correct destination.
<>91
The goods/consignments/equipment have been stored at a location.
<>19
Damaged equipment has been assessed and the quotation sent to lessor.
<>41
The goods/consignments/equipment have been formally passed from one point in the transport chain to another under responsibility of the same transporter. (see also 'handover delivered'.)
<>94
The goods/consignments/equipment have been loaded into a piece of equipment and the equipment has been sealed.
<>58
Equipment previously under hire to a customer has been returned to the lessor and the contract has been terminated.
<>13
Goods/consignments/equipment have been collected from a predetermined location.
<>57
The goods/consignments/equipment to be loaded onto a means of transport have not been loaded on the expected transport.
<>100
The goods/consignments/equipment have been transhipped to another means of transport.
<>16
Goods/consignments/equipment have crossed a border from one country to another.
<>52
There has been a mechanical breakdown of the means of transport/equipment on which the goods/consignments/equipment was being (was to be) moved.
<>1
The means of transport has arrived at a location.
<>26
Equipment has been removed from a position above other equipment on a means of transport.
<>62
Goods/consignments/equipment have been discharged from a means of transport at a specific location when they were not expected to be discharged.
<>76
The goods/consignments/equipment which have been delayed will be/have been reforwarded on request by appropriate authority.
<>32
A piece of equipment has been received in after having been sent out for repair.
<>81
The goods/consignments/equipment have been returned in a wrecked condition to a location as per instructions.
<>71
Goods/consignments/equipment have been made ready for transportation.
<>68
The consignor/consignee has been advised in advance of a transport action.
<>35
The goods/consignments/equipment have been expedited to the next/final destination in the transport chain.
<>86
The goods/consignments/equipment expected to be sent to a specific destination on a selected means of transport from a specific location have not been loaded for onward delivery.
<>47
The goods/consignments/equipment have been moved into a lcl (less than container load)/packing depot.
<>92
The goods/consignments/equipment have been stowed for transportation in the selected equipment/means of transport.
<>11
The port authority has given permission for the goods/consignments/equipment/means of transport to leave the port.
<>55
The goods/consignments/equipment expected to be collected after transportation have not been collected.
<>102
The goods/consignments/equipment are not known to the source being enquired upon.
<>99
The goods/consignments/equipment have been transferred out to another location.
<>50
The goods/consignments/equipment have been included on the list of units moving from one location to another in the transport chain.
<>49
The goods/consignments/equipment have been lost in the course of a movement along the transport chain.
<>14
The process has been completed.
<>7
The booking of goods/consignments/equipment or means of transport previously booked has been cancelled.
<>20
Goods/consignments/equipment have been delayed in the course of transportation.
<>64
Goods/consignments/equipment are awaiting pick-up.
<>39
The goods/consignments/equipment have been moved/are available to be moved from bond.
<>25
The transport has been delayed in departing on the arranged transport action.
<>78
Goods/consignments/equipment have been released to an authorized party.
<>61
Outstanding claims in respect of goods/consignments/equipment have been settled.
<>2
Permission to load has been given by the responsible party.
<>73
The consignee has not given full acknowledgement for the receipt of goods.
<>37
The goods/consignments/equipment previously notified missing have now been located.
<>84
A service has been ordered in relation to the transportation of goods/consignments/equipment.
<>9
Goods/consignments/equipment held prior to loading have now been cleared for export.
<>45
The consignee has been informed formally of the arrival at a transit or final destination of goods/consignments/equipment.
<>90
The goods/consignments/equipment have been stopped from further movement in the transport chain.
<>18
Goods/consignments/equipment have been damaged in the course of transportation.
<>42
The goods/consignments/equipment from one transport operator have been passed to another transport operator. (see also 'handover'.)
<>97
Damaged goods/consignments/equipment have been officially surveyed by a third party to assess the extent of damage.
<>101
The goods/consignments/equipment has been delayed in transit.
<>12
Customs have cleared goods/consignments for import/export.
<>56
The goods/consignments/equipment have not been delivered.
<>22
Delivery of the goods/consignments/equipment has been completed as per instructions.
<>66
The goods/consignments/equipment have been plundered.
<>88
The consignment of goods has been split into two or more consignments.
<>5
The process has begun.
<>27
The goods/consignments/equipment have departed from a location in the transport chain.
<>63
The package was not available for collection.
<>75
Goods/consignments/equipment have been consigned to a party other than the original or subsequent consignees.
<>31
The goods/consignments/equipment are in the normal course of transportation to the next destination.
<>82
Goods/consignments/equipment have been returned to a previous location.
<>28
The goods/consignments/equipment have been unloaded from equipment in which they were transported.