C507 Date/time/period
Composite elementInteractive
Date and/or time, or period relevant to the specified date/time/period type.
Element Details
ID2005NameDate/time/period qualifierLength1/3Codes
- <>69[2138] date by which, or period within which, the merchandise should be delivered to the buyer, as agreed between the seller and the buyer (generic term).
- <>444Date of approval.
- <>400Ultimate date/time at which goods or equipment should be released.
- <>396Date/time on which equipment is requested to be positioned (delivered).
- <>194Date/time on which a period starts.
- <>242Self explanatory.
- <>361The best before date.
- <>158The first date of a period forming a horizon.
- <>206Date/time on which a period (from - to) ends.
- <>325Period a tax rate/tax amount etc. is applicable.
- <>163Date/time when a specific process starts.
- <>419A period for which a forecast applies.
- <>337Date when a person leaves an employer.
- <>171Date/time on which the reference was issued.
- <>236Date/time at which the intake of materials, to be carried to improve the trim and the stability of the means of transport, was completed.
- <>135Date identifying when a telex message was sent.
- <>373Date and time of mooring.
- <>272The specification of the period of time, expressed in number of days, after the date of issuance of the transport document(s) within which the documents must be presented.
- <>348Date on which packing commenced.
- <>95Date as specified on the bill of lading.
- <>429The period coverage has been in force.
- <>430Date from which the anniversary coverage is measured.
- <>59Inland movement authorization date.
- <>301Date of validity of index values.
- <>138[2034] date on which an amount due is made available to the creditor, in accordance with the terms of payment.
- <>266Self explanatory.
- <>345Week days of operation.
- <>147[2078] date of expiry of the validity of an export licence.
- <>222Latest date for presentation of a document.
- <>291Self explanatory.
- <>10Date on which goods should be shipped or despatched by the supplier.
- <>424The last date on which ordering may take place.
- <>54Time at the seller's location.
- <>460Date when a period of wage begins.
- <>261Date/time assigned to identify the release of a set of rules, conditions, conventions, productions, etc.
- <>379The date on which a periodic inspection has to take place.
- <>278Lead time is the defined timespan.
- <>342The date goods have been loaded on board of a conveyance.
- <>140Date/time at which funds should be made available.
- <>225Date/time at which the carrier proceeds to the weighting of the goods.
- <>296Date/time on which the retention is released.
- <>17Date and/or time when the shipper of the goods expects delivery will take place.
- <>423The first date on which ordering may take place.
- <>53Time at the buyer's location.
- <>306Period of execution of works.
- <>415The date applicable to the activity being reported.
- <>65Self explanatory.
- <>448Creation date of referenced item.
- <>451Date source document data is entered into a business application.
- <>38Date/time by which the goods should have been shipped.
- <>213Calculation is based on year of 365-6 days, month of 30 days.
- <>312Shipment(s) of goods is/are to be made not before the first specified date/time and not after the second specified date/time.
- <>110Self explanatory.
- <>198Last of a number of days allowed in a charter party for the loading and discharging of cargo.
- <>383Cancel the order if goods not shipped by this date.
- <>181Date/time when equipment is positioned.
- <>257Self explanatory.
- <>356The date, and or time, and or period on which a sale took place.
- <>154Self explanatory.
- <>282Lead time is referenced to the date of confirmation.
- <>329Date/time when a person was born.
- <>21Description to be provided.
- <>443Date the item was directly interchanged.
- <>407Date/time on which the document is requested by a party.
- <>218Self explanatory.
- <>319Date at which funds are taken into account for interest calculation (in debit or credit).
- <>391Lead time to determine the date an item will be approved based on the date the item was received.
- <>193The date when ordered bank initiated the transaction.
- <>388The date when an order amendment becomes binding for both parties.
- <>245Year in which the treaty was commenced.
- <>366Date on which a inventory report is made.
- <>201Date/time at which the equipment is picked up.
- <>322Self-explanatory.
- <>164Date/time when a specific process ends.
- <>36Date of expiry of the validity of a referenced document, price information or any other referenced data element with a limited validity period.
- <>85Shipment might take place latest at given date.
- <>402Date/time on which the document was actually received.
- <>394Date/time on which equipment was actually positioned (delivered).
- <>196Date/time of earliest departure of means of transport.
- <>125[2292] date when import licence is issued.
- <>240To identify a reinsurance account period via start and end dates. note: this period is not the same as "reinsurance current account period".
- <>8Date/time when the purchase order is received by the seller.
- <>363A period indicating the total shelf life of a product.
- <>259Date when a vessel, vehicle or other means of transport was registered by a competent authority.
- <>358Scheduled for delivery on or after the specified date, and or time.
- <>204Date on which customs releases merchandise to the carrier or importer.
- <>327Self-explanatory.
- <>161Date the customer authorised the goods' release.
- <>72Delivery might take place earliest at given date.
- <>446The date the estimate was revised.
- <>108Self explanatory.
- <>133Date/time when carrier estimates that a means of transport should depart at the place of departure.
- <>375Date of first registration.
- <>274Lead time is the defined timespan.
- <>229The date and/or time hoses were connected.
- <>46Date on which a document or message has been cancelled.
- <>93Date when a contract expires.
- <>436The date up to which the reinsurance has been paid.
- <>331Date/time when contributions cease.
- <>177The information must be advised on the date/time indicated.
- <>230The date and/or time hoses were disconnected.
- <>268Description to be provided.
- <>370The date on which foreign-built container equipment has entered into the commerce of another country and has become domestic equipment.
- <>271Date on or about which goods should be shipped.
- <>149Date required for invoice issue.
- <>96Date/time when goods should, might or have been discharged from the means of transport.
- <>433The period for which reinsurance coverage has been in force.
- <>334Date/time when a status changes.
- <>172Date from which an item has been or will be hired.
- <>235In relation with the arrangements agreed between buyer and seller or between sender and main transport it may be necessary to specify the latest collection date/time.
- <>136[2280] date (and time) of departure of means of transport.
- <>340Date/time when a person joins a fund.
- <>142The date a labour wage is determined.
- <>227Date on which funds should be made available to the beneficiary's bank.
- <>294Date/time on which hand over (i.e. the transfer of responsibility for an object or activity such as documentation, system etc. from one party to another) is planned to take place.
- <>48Duration.
- <>15Date/time when promotion activities begin.
- <>421To estimate the date of acceptance.
- <>438The period of time the insured must be disabled before reinsurance coverage becomes effective.
- <>51First date for accumulation of delivery quantities.
- <>465Date and time at which crew and/or passengers disembark.
- <>179Date at which the booking was made.
- <>304Value date of indexes appearing as numerators in a price adjustment formula.
- <>263Period for which an invoice is issued.
- <>453The date of the source document.
- <>89Self explanatory.
- <>211Calculation is based on year of 360 days, month of 30 days.
- <>310Date/time of receipt.
- <>398Date/time at which goods can be picked up, according to a planning.
- <>381The total lifespan of a product at the time of its production.
- <>183Date related to a given context.
- <>129Date when imported vessel/merchandise last left the country of export for the country of import.
- <>4[2010] date when an order is issued.
- <>255Date when ordered items should be available at a specified location.
- <>354A specific date range associated with an activity.
- <>156Self explanatory.
- <>280Lead time is the defined timespan.
- <>208Date/time at which a means of transport has to depart ultimately.
- <>417Date/time at which the previous booking was made.
- <>67Delivery date deriving from actual schedule.
- <>409Date/time on which the order should be completed at the latest.
- <>216Calculation is based on year of 365 days, month of 30 days.
- <>317Self explanatory.
- <>115Date as of a sample will be available seller defined.
- <>184Date/time of notification.
- <>368Date on which the latest reading of a meter took place.
- <>3[2376] date when a commercial invoice is issued.
- <>252Date/time that the conveyance arrives at the initial port in the country of destination.
- <>353Date to which an accounting transaction refers.
- <>151Date on which goods are imported, as determined by the governing customs administration.
- <>287Date/time on which the contract is awarded to a tenderer.
- <>410Ultimate date/time on which a piece of equipment must be repaired.
- <>79Shipment might happen at given date/time.
- <>60Date the engineering level of goods is changed.
- <>454Date against which the entry has to be legally allocated.
- <>118Date/time at which the cargo booking has been accepted by the carrier.
- <>392Date/time on which equipment can be picked up at the earliest.
- <>190Date and time of the transfer of the goods from one means of transport to another.
- <>189Date (and time) of scheduled departure of means of transport.
- <>123The latest date/time for presentation of the documents to the bank where the credit expires.
- <>246Year considered for accounting of the treaty or portion of the treaty.
- <>365The date on which the packaging of a product took place.
- <>202The date when an entry is posted to an account.
- <>321Date/period relevant for specific promotion activities.
- <>167The charge period's first date.
- <>74Delivery is requested to happen prior to or including the given date.
- <>440Date of amendment of a documentary credit.
- <>459Date when two persons are married.
- <>404Date/time when the specified goods or transport equipment has or have been loaded in or on the means of transport.
- <>377The date on which container equipment is to be or has been inspected in accordance with the requirements of the u.s. federal highway administration.
- <>276Lead time is the defined timespan.
- <>298Value date of the indexes appearing as denominators in an escalation formula.
- <>44Date/time when received item is available.
- <>91Self explanatory.
- <>434Date at which maturity occurs.
- <>333Date/time when the proportion of part-time work changes.
- <>175The information must be advised before the date/time indicated.
- <>232Date (and time) of scheduled arrival of means of transport.
- <>308Date/time on which the payment valuation is presented.
- <>131Date on which tax is due or calculated.
- <>349Date on which packing completed.
- <>94Date on which goods are produced.
- <>428The original issue age.
- <>431Period for charging the additional extra.
- <>58(3080) date on which customs formalities necessary to allow goods to be exported, to enter home use, or to be placed under another customs procedure has been accomplished (ccc).
- <>336Date when a change in salary becomes effective.
- <>170More generic than 'payment due date' and therefore more apt for reinsurance/insurance business.
- <>237The date and/or time tank cleaning was completed.
- <>134Date/time on which the exchange rate was fixed.
- <>372The date on which equipment is pre-tripped.
- <>273Dates (from/to)/period referenced documents are valid.
- <>13Date by which payment must be made.
- <>427The adjusted age used for purposes of calculation.
- <>463Date when a period of work ends.
- <>339Date/time when a change of category is made.
- <>238The date and/or time the tanks are to be or have been accepted.
- <>302Self explanatory.
- <>265Self explanatory.
- <>346Latest time of check-in.
- <>144Date that the quota applies to.
- <>221Number of days used for the calculation of interests.
- <>292Self explanatory.
- <>16Date/time when promotion activities end.
- <>422The date the documentary credit has been issued.
- <>52Last date for accumulation of delivery quantities.
- <>307Date/time on which a payment instruction was given.
- <>260Date when customs valuation was made.
- <>378The date on which container equipment is to be or has been inspected as per the container safety convention (csc).
- <>279Lead time is the defined timespan.
- <>343Date/time when the deduction from an amount comes to an end.
- <>141[2032] date on which a goods declaration is presented or lodged with customs.
- <>224Date on which permission was granted to move merchandise into a bonded warehouse or free trade zone.
- <>297Date/time on which the retention is partially released.
- <>384Indicates the date which was allocated to a previous invoice.
- <>186(2280) date (and time) of departure of means of transport.
- <>249Date on which a cash call was made for a loss suffered and covered.
- <>250Date of re-exportation.
- <>351Date of inspection.
- <>153The latest date/time on which cancellation of the payment order may be requested.
- <>285Date/time on which the invitation to tender has been made available to relevant parties.
- <>168The charge period's last date.
- <>412Date/time on which the container stripping should be completed at the latest.
- <>456Period covered by the chart of account.
- <>214Calculation is based on year of 365-6 days, month of 28- 31 days.
- <>315Date on which the debtor agreed to pay.
- <>117First possible date/time for delivery.
- <>244Self explanatory.
- <>367Date on which the previous reading of a meter took place.
- <>288Base date/time of prices.
- <>200Date/time at which the cargo is picked up.
- <>323Period forming a (planning) horizon.
- <>165Date when a tax period begins.
- <>76Self explanatory.
- <>442Date the item was last returned from hire.
- <>81Shipment should happen earliest at given date.
- <>406The date/time on which the goods will be positioned according to a planning.
- <>219Date/time at which goods are transferred across a country border.
- <>318Self explanatory.
- <>390Lead time to determine the delivery date based on the date an award is made.
- <>192Date on which validity of a customs document expires.
- <>389Specifies the length of time that an article was or should be cured.
- <>207Date/time on which the intake of materials to be carried to improve the trim and the stability of the means of transport, was commenced.
- <>324Date/period a specific process happened/will happen.
- <>162Date when the supplier released goods.
- <>418The minimum shelf life remaining at the time of receipt.
- <>71Delivery is requested to happen after or on given date.
- <>445The date of the original estimate.
- <>35Date/time on which goods or consignment are delivered at their destination.
- <>401Date on which the validity of a container safety convention (csc) plate expires.
- <>397Date/time on which equipment should be positioned (delivered) at the latest.
- <>195[2272] date of expiry of the validity of an import licence.
- <>126[2326] date when a contract is agreed.
- <>243Self explanatory.
- <>360The date by which a product should be sold.
- <>159The last date of a period forming a horizon.
- <>47Date for statistical time series purposes.
- <>92Date when a contract becomes valid.
- <>437The period of time for which benefits are provided.
- <>330Date when a person joins an employer.
- <>176The advise has been completed at the date indicated.
- <>231Date/time of earliest arrival of means of transport.
- <>109Self explanatory.
- <>132(2348) date/time when carrier estimates that a means of transport should arrive at the port of discharge or place of destination.
- <>374The date of expiry of the road fund tax.
- <>275Lead time is the defined timespan.
- <>228Date on which the account owner wants the debit value to his account.
- <>11(2170) date/time on which the goods are or are expected to be despatched or shipped.
- <>425Date when the entry was originally posted.
- <>55Date/time which has been confirmed.
- <>461Date when a period of wage ends.
- <>300Limit value date of indexes used as numerators in a price adjustment formula.
- <>267Date/time on which a rate/price is determined.
- <>344Date/time when the interest has to be paid.
- <>146Date on which the official date of customs entry is anticipated.
- <>223New date and time of delivery calculated on basis of a consignee's requirement (chargeable).
- <>290Date/time on which activities stated in the contract must start.
- <>420To report the date and time that an unloading action occurred.
- <>439The period of time for which an activity has been postponed.
- <>50Date/time upon which the goods were received by a given party.
- <>464Date and time at which crew and/or passengers board.
- <>178[2106] date (and time) of arrival of means of transport.
- <>305Date on which the latest price adjustment took place.
- <>107Self explanatory.
- <>262Date/time/period when an enterprise is closed.
- <>341The period of time between the moment at which one wants an activity to begin and the moment at which this activity can actually begin.
- <>143[2126] date on which the goods are taken over by the carrier at the place of acceptance (cmr 4).
- <>226Date/time at which a discrepancy has been found.
- <>295Date/time on which hand over (i.e. the transfer of responsibility for an object or activity such as documentation, system etc. from one party to another) actually takes place.
- <>49Deliver not before and not after a specific date range.
- <>14Date/time when instalments are due.
- <>7Date and/or time at which specified event or document becomes effective.
- <>256Lead time to determine the completion date of an effort based on the date an award is made.
- <>357Cancel if not published by this date.
- <>155Self explanatory.
- <>283Lead time is referenced to the date a transport will arrive or has arrived.
- <>328Date/time of a monetary deduction made from the salary of a person on a payroll.
- <>20Date/time when cheque is issued.
- <>414Date/time on which equipment has been ascertained as being in stock.
- <>64Date identifying a point in time before which the goods shall not be delivered.
- <>449Date for the last update.
- <>450Date of opening.
- <>39Date identifying the week during which goods should be shipped.
- <>212Calculation is based on year of 360 days, month of 28-31 days.
- <>313Issue date of an instruction to start work.
- <>111Self explanatory.
- <>199The date and/or time the goods have to be or have been positioned.
- <>382The earliest date on which the product may be made available for sale.
- <>180Final date for delivering cargo to a liner ship.
- <>411Date/time on which the container stuffing should be completed at the latest.
- <>61Self explanatory.
- <>455Date on which the funds are expected to be at the disposal of the beneficiary.
- <>408Estimated date and time when the containers are expected to go on-hire.
- <>217Lead time to determine the latest date a delivery can be made based on the date an award is made.
- <>316Date/time of valuation.
- <>114Date as of a tool has to be available customer defined.
- <>387Provides the period of time necessary to turnaround a given repair.
- <>185The date/and or time tank cleaning was started.
- <>2Date on which buyer requests goods to be delivered.
- <>369The date and or time when the handling action is estimated to take place.
- <>253Date/time that conveyance departed from the last foreign port of call.
- <>352Date on which slaughtering completed.
- <>150Date when item has been or has to be declared/presented.
- <>286Date/time on which the tender was submitted.
- <>447Date on which the creditor requests to be credited.
- <>37Goods should not be shipped before given date/time.
- <>84Shipment should take place latest at given date.
- <>403Date/time when the specified goods or transport equipment has or have been discharged from the means of transport.
- <>395Date/time on which equipment is estimated to be positioned (delivered).
- <>197First of a number of days allowed in a charter party of the loading and discharging of cargo.
- <>124[2218] date when a despatch note is issued.
- <>241Lead time to determine the earliest date a delivery can be made based on the date an award is made.
- <>9Date/time of processing.
- <>362The end date of availability.
- <>258Date when guarantee is placed with customs.
- <>359Scheduled for delivery on or before specified date and or time.
- <>205Date for settlement of financial transaction e.g. foreign exchange securities.
- <>326Period a specified charge is valid for.
- <>160Date when an authorization was given.
- <>435The actual or equivalent age at time of issue.
- <>332Date/time when a contribution period ends.
- <>174The information must be advised after the date/time indicated.
- <>233Date (and time) of ultimate arrival of means of transport.
- <>309The date on which the funds are at the disposal of the receiving bank.
- <>376The date on which a biannual inspection of a terminal has taken or will take place.
- <>277Lead time is the defined timespan.
- <>299Value date of the indexes appearing as denominators in a price adjustment formula.
- <>ZZZSelf explanatory.
- <>45Date and time of the compilation.
- <>90Self explanatory.
- <>18Self explanatory.
- <>432Date to which payments have been paid.
- <>335Date/time when a contribution period commences.
- <>173Date until which an item has been or will be hired.
- <>234The transport order may be issued before the goods are ready for picking up. this date/time indicates from when on the carrier can have access to the consignment.
- <>137(2006) date/time when a document/message is issued. this may include authentication.
- <>371The date equipment has been hydrotested.
- <>270The date identifying the period during or in which the goods should be shipped.
- <>148[2036] date on which a goods declaration is accepted by customs in accordance with customs legislation.
- <>42Date/time being overlaid by a date given elsewhere.
- <>97Self explanatory.
- <>462Date when a period of work begins.
- <>338Date/time when a benefit provided by a service provider is changed.
- <>239The date and/or time the tanks are to be or have been inspected.
- <>303Value date of indexes appearing as numerators in an escalation formula.
- <>101Date as of there is no valid production schedule.
- <>264Frequency of a release.
- <>347Date on which slaughtering commenced.
- <>145A date specifying an event.
- <>293Self explanatory.
- <>12Date by which payment should be made if discount terms are to apply.
- <>426The frequency of payments of reinsurance premiums.
- <>209Date on which the funds are at the disposal of the beneficiary or cease to be at the disposal of the ordering customer.
- <>22Date/time when freight bill is issued.
- <>416The date of a submission.
- <>452Period covered by the trial balance.
- <>210Description to be provided.
- <>311Fixed maturity day for deferred payment or time draft(s).
- <>113Date as of a sample has to be available customer defined.
- <>399Date/time on which goods are expected to be positioned.
- <>380Date the drawing revision has been allocated to a design.
- <>182Date when a document/message has been or will be issued.
- <>128Date when the last delivery should be or has been accomplished.
- <>254Registration date of the customs declaration for the previous customs procedure either in the same or another country.
- <>355The date of delivery contractually agreed between parties.
- <>157Self explanatory.
- <>281Lead time is referenced to the date of order.
- <>413Date/time when all discharge and loading operations on the transport means have been completed.
- <>63Date identifying a point of time after which goods shall not or will not be delivered.
- <>457Date of marital separation.
- <>215Calculation is based on year of 365 days, month of 28-31 days.
- <>314Self explanatory.
- <>116Period until which equipment is expected to be hired.
- <>187Date/time when the document is signed or otherwise authenticated.
- <>248Date, time, period on which a referenced loss occurred.
- <>251Date of re-importation.
- <>350Date when a test has been started.
- <>152Date when imported textiles last left the country of origin for the country of importation.
- <>284Lead time is the defined timespan.
- <>169Time required between order entry till earliest goods delivery.
- <>75Delivery might take place latest at given date.
- <>441Date the item was last placed on hire.
- <>458Date when two married persons are officially divorced.
- <>405Date/time on which the equipment was actually collected.
- <>119Date when a test has been completed.
- <>393Date/time on which equipment can be picked up, either full or empty, according to a planning.
- <>191Date/time on which goods are expected to be delivered.
- <>188Date of the previous current account.
- <>247Year in which a specific event (e.g. a loss) took place.
- <>364Period indicating the minimum shelf life remaining for a product at the time of leaving the supplier.
- <>203The date/time on which the ordered bank is requested to initiate the payment order, as specified by the originator (e.g. the date of the debit).
- <>320Reference period of a set of items reported on the same declaration.
- <>166Date when a tax period ends.