C555 Status event
Composite elementInteractive
To specify a status event.
Element Details
ID9011NameStatus event, codedLength1/3Codes
- <>70Equipment has been placed above other equipment and placed on a means of transport.
- <>69The goods/consignments/equipment have been written off and disposed of.
- <>34A damaged piece of equipment has been repaired.
- <>87The goods/consignments/equipment have been sorted erroneously to an incorrect route.
- <>40The goods/consignments/equipment have arrived/are available at port.
- <>95In the leasing of equipment a sub-lease has been notified to the lessor.
- <>59The goods/consignments/equipment previously loaded to a means of transport have been removed from that means of transport before completion of the planned transport.
- <>103Equipment, e.g. a refrigerated container, has been unplugged from the power source at a given location.
- <>98The goods/consignments/equipment have been transferred in from another location.
- <>10Goods/consignments/equipment have been held prior to shipment and are now cleared for shipment following examination by relevant authority.
- <>54The goods/consignments/equipment expected to be located and identified in the transport chain cannot be identified.
- <>17The customs authorities have refused to clear the goods/consignments/equipment.
- <>53The goods/consignments/equipment expected to be picked up and conveyed from location to location in the transport chain have not been picked up.
- <>65Equipment, e.g. a refrigerated container, has been plugged into the power source.
- <>38The freight charges on goods/consignments/equipment have been paid.
- <>6Goods/consignments/equipment or means of transport have been booked for subsequent movements.
- <>21The goods/consignments/equipment have been delivered to a location/party in the transport chain.
- <>33A piece of equipment has been sent out for repair.
- <>80The goods/consignments/equipment have been returned to a location as per instructions.
- <>77The transport action/documentation has been refused without explanation.
- <>36The goods/consignments/equipment notified to be missing have not been located.
- <>85Goods/consignments/equipment expected to be discharged from a means of transport at a specific location have not been discharged.
- <>8Goods/consignments/equipment held for import restriction purposes have been released for import.
- <>72The consignee has given full acknowledgement for the receipt of goods.
- <>46The goods/consignments/equipment have been moved/is available to be moved into bond.
- <>93The goods/consignments/equipment have been loaded into a piece of equipment, e.g. a container.
- <>43The goods/consignments/equipment have been received by one transport operator from another transport operator.
- <>96In the leasing of equipment a sub-lease has been notified by a lessee.
- <>48The goods/consignments/equipment have been loaded onto a means of transport.
- <>15Goods/consignments have been added to other goods/ consignments to form a larger consignment and/or have been incorporated into one or more containers/units.
- <>51The means of transport on which the goods/consignments/equipment was being (was to be) moved has been damaged.
- <>89The equipment, e.g. a container, has been steam cleaned.
- <>4Equipment previously the subject of a 'defective condition' status has been returned to service.
- <>23Delivery of the goods/consignments/equipment has not been completed in accordance with instructions.
- <>67Goods/consignments/equipment have been positioned on a means of transport.
- <>3Goods/consignments/equipment have been received or a means of transport has arrived in a defective condition.
- <>24The means of transport has departed from a location in the transport chain.
- <>79Goods/consignments/equipment have been reloaded onto a means of transport.
- <>60Equipment has been hired out to a hirer/customer.
- <>29The goods/consignments/equipment have been unloaded from a means of transport.
- <>74Goods/consignments/equipment have been received at a location/party in the transport chain.
- <>30The package/equipment has been found to be empty.
- <>83The equipment has been sealed according to operational and governmental requirements.
- <>44The goods/consignments/equipment which were previously sent to a wrong destination are on the way to correct destination.
- <>91The goods/consignments/equipment have been stored at a location.
- <>19Damaged equipment has been assessed and the quotation sent to lessor.
- <>41The goods/consignments/equipment have been formally passed from one point in the transport chain to another under responsibility of the same transporter. (see also 'handover delivered'.)
- <>94The goods/consignments/equipment have been loaded into a piece of equipment and the equipment has been sealed.
- <>58Equipment previously under hire to a customer has been returned to the lessor and the contract has been terminated.
- <>13Goods/consignments/equipment have been collected from a predetermined location.
- <>57The goods/consignments/equipment to be loaded onto a means of transport have not been loaded on the expected transport.
- <>100The goods/consignments/equipment have been transhipped to another means of transport.
- <>16Goods/consignments/equipment have crossed a border from one country to another.
- <>52There has been a mechanical breakdown of the means of transport/equipment on which the goods/consignments/equipment was being (was to be) moved.
- <>1The means of transport has arrived at a location.
- <>26Equipment has been removed from a position above other equipment on a means of transport.
- <>62Goods/consignments/equipment have been discharged from a means of transport at a specific location when they were not expected to be discharged.
- <>76The goods/consignments/equipment which have been delayed will be/have been reforwarded on request by appropriate authority.
- <>32A piece of equipment has been received in after having been sent out for repair.
- <>81The goods/consignments/equipment have been returned in a wrecked condition to a location as per instructions.
- <>71Goods/consignments/equipment have been made ready for transportation.
- <>68The consignor/consignee has been advised in advance of a transport action.
- <>35The goods/consignments/equipment have been expedited to the next/final destination in the transport chain.
- <>86The goods/consignments/equipment expected to be sent to a specific destination on a selected means of transport from a specific location have not been loaded for onward delivery.
- <>47The goods/consignments/equipment have been moved into a lcl (less than container load)/packing depot.
- <>92The goods/consignments/equipment have been stowed for transportation in the selected equipment/means of transport.
- <>11The port authority has given permission for the goods/consignments/equipment/means of transport to leave the port.
- <>55The goods/consignments/equipment expected to be collected after transportation have not been collected.
- <>102The goods/consignments/equipment are not known to the source being enquired upon.
- <>99The goods/consignments/equipment have been transferred out to another location.
- <>50The goods/consignments/equipment have been included on the list of units moving from one location to another in the transport chain.
- <>49The goods/consignments/equipment have been lost in the course of a movement along the transport chain.
- <>14The process has been completed.
- <>7The booking of goods/consignments/equipment or means of transport previously booked has been cancelled.
- <>20Goods/consignments/equipment have been delayed in the course of transportation.
- <>64Goods/consignments/equipment are awaiting pick-up.
- <>39The goods/consignments/equipment have been moved/are available to be moved from bond.
- <>25The transport has been delayed in departing on the arranged transport action.
- <>78Goods/consignments/equipment have been released to an authorized party.
- <>61Outstanding claims in respect of goods/consignments/equipment have been settled.
- <>2Permission to load has been given by the responsible party.
- <>73The consignee has not given full acknowledgement for the receipt of goods.
- <>37The goods/consignments/equipment previously notified missing have now been located.
- <>84A service has been ordered in relation to the transportation of goods/consignments/equipment.
- <>9Goods/consignments/equipment held prior to loading have now been cleared for export.
- <>45The consignee has been informed formally of the arrival at a transit or final destination of goods/consignments/equipment.
- <>90The goods/consignments/equipment have been stopped from further movement in the transport chain.
- <>18Goods/consignments/equipment have been damaged in the course of transportation.
- <>42The goods/consignments/equipment from one transport operator have been passed to another transport operator. (see also 'handover'.)
- <>97Damaged goods/consignments/equipment have been officially surveyed by a third party to assess the extent of damage.
- <>101The goods/consignments/equipment has been delayed in transit.
- <>12Customs have cleared goods/consignments for import/export.
- <>56The goods/consignments/equipment have not been delivered.
- <>22Delivery of the goods/consignments/equipment has been completed as per instructions.
- <>66The goods/consignments/equipment have been plundered.
- <>88The consignment of goods has been split into two or more consignments.
- <>5The process has begun.
- <>27The goods/consignments/equipment have departed from a location in the transport chain.
- <>63The package was not available for collection.
- <>75Goods/consignments/equipment have been consigned to a party other than the original or subsequent consignees.
- <>31The goods/consignments/equipment are in the normal course of transportation to the next destination.
- <>82Goods/consignments/equipment have been returned to a previous location.
- <>28The goods/consignments/equipment have been unloaded from equipment in which they were transported.