<>84
Self explanatory.
<>150
Indication of actual cumulated quantity of previous and actual amortization order quantity.
<>172
The quantity of the referenced item which has a cost for tooling amortisation included in the item price.
<>114
Total number of passengers on the conveyance.
<>51
Inventory that has been moved from one inventory category to another.
<>73
Difference between quantity ordered and quantity received.
<>217
Quantity of inventory which was requested but was not available.
<>149
Indication of actual share of the order quantity for amortization.
<>48
The quantity which has been received.
<>185
The quantity of received goods rejected for quantity reasons.
<>136
Quantity reached during this period.
<>61
Self explanatory.
<>205
The quantity of magazines or newspapers grouped together with the spine facing alternate directions in a bundle.
<>96
Quantity of goods which have failed quality control.
<>197
Quantity at which an order may be triggered to replenish.
<>160
The quantity specified is the minimum output from a single production run.
<>106
The number of packages on which charges are based.
<>124
Quantity of goods which have deteriorated in transport such that they cannot be used for the purpose for which they were originally intended.
<>179
The number of deliveries normally expected to be despatched within each despatch period.
<>25
Quantity of retail point of sale activity.
<>78
Adding the quantity actually scheduled to previous cumulative quantity.
<>142
Total quantity planned.
<>183
This delivery instruction does not contain any delivery requirements.
<>208
Quantity of the material needed to maintain and repair equipment.
<>130
Quantity relevant for allowance.
<>82
Self explanatory.
<>156
To specify the quantity of an inventory movement.
<>129
Number of units per unit price.
<>174
The total quantity of the referenced item which has a cost for tooling amortisation included in the item price.
<>112
The length on which charges are based.
<>28
Quantity of goods or services sold to a military organization.
<>57
A quantity that is enroute.
<>211
Quantity to override the normal replenishment model calculations, but not intended to permanently change the model parameters.
<>75
Cumulative quantity after complete delivery of all scheduled quantities of the product from a prior schedule period.
<>31
Self explanatory.
<>36
Description to be provided.
<>148
Indication of final quantity for amortization.
<>49
Distance really charged by tariff appliance.
<>184
Quantity of the referenced material within the ordered time.
<>137
Estimated cumulative quantity reached in the preceding period.
<>85
Self explanatory.
<>151
Quantity advised by supplier or shipper, in contrast to quantity actually received.
<>173
The cumulative quantity of the referenced item which had a cost for tooling amortisation included in the item price.
<>115
Total number of crew members on the conveyance.
<>50
Product quantity that has not yet had its disposition determined.
<>72
Cumulative quantity of all deliveries of the product received by the buyer till end of prior year.
<>216
Quantity reserved for consumer delivery or pickup and not yet withdrawn from inventory.
<>101
The gross weight on which charges are based.
<>123
If quantity of goods actually landed is more than the quantity which appears in the documentation. this quantity is the difference between these quantities.
<>118
Quantity of goods contracted for delivery by the carrier.
<>22
Equivalent quantity at 100% purity.
<>145
The stock on hand, undamaged, and available for despatch, sale or use.
<>202
To indicate the quantity required for the next higher assembly.
<>66
Quantity a party is committed to.
<>189
The number of packages contained in one handling unit.
<>91
Quantity remaining after partial delivery.
<>88
The value recorded or read from a measuring device (e.g. meter) for information purposes.
<>190
The item quantity specified on the despatch note.
<>167
The total quantity required by the buyer to be delivered.
<>83
Self explanatory.
<>157
To specify the quantity of an opening stock balance.
<>128
Quantity of goods loaded onto a means of transport.
<>175
The number of pressing moulds contained within a single piece of the referenced tooling.
<>113
The quantity to be delivered.
<>29
Sale of product in restaurants or bars.
<>56
Sale of product to other wholesalers by a wholesaler.
<>210
Quantity returned by a consumer.
<>74
Cumulative quantity after complete delivery of all scheduled quantities of the product.
<>12
Quantity despatched by the seller.
<>30
Sale of product directly to a store.
<>182
Quantity of the referenced item which has previously been ordered and is now cancelled.
<>209
Incremental needs over and above normal replenishment calculations, but not intended to permanently change the model parameters.
<>131
Quantity required by buyer to be delivered.
<>86
The value recorded or read from a measuring device (e.g. meter) in the normal conditions.
<>169
Quantity of the referenced item actually shipped.
<>152
The total quantity of a product on hand at a location. this includes as well units awaiting return to manufacturer, units unavailable due to inspection procedures and undamaged stock available for despatch, resale or use.
<>170
Quantity of the referenced item allocated from available stock for delivery.
<>116
Total number of air waybills, bills of lading, etc. being reported for a specific conveyance.
<>53
Self explanatory.
<>215
Quantity of inventory received which cannot be sold in its present condition.
<>71
Cumulative quantity of all deliveries, outstanding and scheduled orders.
<>17
Self explanatory.
<>35
The minimum quantity of a quantity range for a specified (unit) price.
<>68
The quantity recorded at the end of an agreement or period.
<>187
The quantity scheduled for delivery.
<>134
Cumulative quantity planned for now.
<>188
Number of identical handling units in terms of type and contents.
<>203
Provides the standard quantity of an article in which one unit can be issued.
<>67
The value that is estimated to be the reading of a measuring device (e.g. meter).
<>90
Self explanatory.
<>89
Quantity of goods held pending completion of a quality control assessment.
<>191
An adjustment to inventory quantity.
<>166
The total quantity of the referenced covering all future needs. further orders of the referenced item are not expected.
<>100
The weight on which charges are based.
<>1
Self explanatory.
<>122
If quantity of goods actually landed is less than the quantity which appears in the documentation. this quantity is the difference between these quantities.
<>119
Indication that part of the consignment was not shipped.
<>23
Quantity at 100% active agent content.
<>18
Quantity previously referenced.
<>144
Plus or minus tolerance expressed as a monetary amount.
<>141
Surveyed quantity reached during this period.
<>40
Quantity normally delivered by the seller.
<>206
Recommended quantity of an article which is required to meet an agreed level of maintenance.
<>62
Description to be provided.
<>95
Self explanatory.
<>194
Quantity which has been received and accepted at a given location.
<>163
Quantity of the referenced item required prior to full production.
<>105
The number of rail wagons on which charges are based.
<>158
To specify the quantity of a closing stock balance.
<>127
The quantity concerning the same transaction differs between two documents/messages and the source of this difference is a typing error.
<>26
A quantity associated with a promotional event.
<>59
Self explanatory.
<>52
Self explanatory.
<>214
Quantity which was transferred into this location.
<>70
Cumulative quantity of all deliveries of this article received by the buyer.
<>186
The cumulative quantity scheduled up to the accumulation start date.
<>69
The quantity recorded at the start of an agreement or period.
<>135
Quantity planned for this period.
<>87
The value recorded or read from a measuring device (e.g. meter) by the customer.
<>168
The quantity required by the buyer to be delivered in a single shipment.
<>153
Quantity of goods sold in a specified period.
<>171
The number of pallets/handling units which can be safely stacked one on top of another.
<>117
Quantity of goods actually arrived.
<>192
Quantity of goods which are free of charge.
<>165
The multiples in which delivery batches can be supplied.
<>103
The number of axles on which charges are based.
<>2
Quantity relevant for charge.
<>121
Indication that more goods have been shipped than contracted for delivery.
<>20
Self explanatory.
<>219
Quantity subject to taxation.
<>147
Quantity to be shipped directly to a customer from a manufacturing site.
<>46
Number of pieces actually received at the final destination.
<>200
Free quantity not included in ordered quantity.
<>64
Remainder of the total quantity after split deliveries.
<>138
Estimated cumulative quantity reached now.
<>93
Quantity delivered to a respective order after it's final delivery.
<>94
Quantity delivered replacing previous deliveries.
<>195
Quantity which has been received but not accepted at a given location and which will consequently be returned to the relevant party.
<>162
The quantity defined is a sample for the purpose of validating function and performance.
<>104
The number of containers on which charges are based.
<>159
Number of times a means of transport stops before arriving at destination.
<>126
Quantity of goods that disappeared in transport.
<>58
Quantity withdrawn from a location.
<>27
Article received which cannot be shipped in its present form.
<>140
Surveyed cumulative quantity reached now.
<>63
Description to be provided.
<>207
Number of labour hours.
<>132
Cumulative quantity originally planned for the preceding period.
<>99
Self explanatory.
<>198
Quantity which is currently in transit.
<>80
A corrector reading before it has been adjusted.
<>154
Quantity of goods required to meet future demands. - market intelligence quantity.
<>109
The volume on which charges are based.
<>176
The number of related items which can be produced simultaneously with a single piece of the referenced tooling.
<>8
Quantity of goods which the customer requires the supplier to have in inventory and which may be inspected by the customer if desired.
<>110
The cubic measurements on which charges are based.
<>55
The summation of total quantity sales.
<>213
Quantity which was transferred out of this location.
<>77
Number of work days, e.g. per respective period.
<>11
Part of the whole quantity.
<>33
Self explanatory.
<>181
The quantity specified is the maximum output from a single production run.
<>146
The stock quantity required or planned to have on hand, undamaged and available for use.
<>47
The quantity as per invoice.
<>201
To indicate the recommended quantity of an article required to support overhaul and repair activities.
<>65
Self explanatory.
<>139
Surveyed cumulative quantity reached in the preceding period.
<>92
Quantity of final delivery to a respective order.
<>193
Free quantity included in ordered quantity.
<>164
Quantity of the referenced item which constitutes a standard batch for deliver purposes.
<>102
The tare weight on which charges are based.
<>3
Self explanatory.
<>120
Indication that the consignment has been split into two or more shipments.
<>21
The quantity which has been ordered.
<>218
Quantity returned in a damaged or defective condition.
<>24
Quantity of goods which the customer requires the supplier to have in inventory but which will not be checked by the customer.
<>79
Cumulative quantity prior the actual order.
<>143
Quantity remaining.
<>60
Current inventory quantity available for shipment.
<>204
Provides the cumulative quantity of an item which has been identified as scrapped.
<>97
Minimum stock quantity on which replenishment is based.
<>196
Quantity which has been received but not accepted at a given location and which will consequently be destroyed.
<>161
The quantity defined is a sample for the purpose of validating dimensions.
<>107
The number of units on which charges are based.
<>125
Quantity of goods stolen during transport.
<>178
Maximum production output of the referenced tool over its productive lifetime.
<>177
Maximum production output of the referenced tool over a period of time.
<>111
The surface area on which charges are based.
<>54
Self explanatory.
<>212
Net quantity sold which includes returns of saleable inventory and other adjustments.
<>76
A corrector reading after it has been adjusted.
<>32
Self explanatory.
<>180
The quantity of a referenced component supplied by the buyer for manufacturing of an ordered item.
<>133
Cumulative quantity reached in the preceding period.
<>98
Maximum stock quantity on which replenishment is based.
<>199
Quantity which has been withdrawn from inventory since the last inventory report.
<>81
Non scheduled additional quantity.
<>155
Quantity required to maintain the requisite on-hand stock of goods.
<>108
The period of time on which charges are based.