MOA Monetary amount

SegmentOptAtMax 2

To specify a monetary amount.

Elements

PositionElementNameRequirementTypeMin/MaxRepeat
10
C516Monetary amountMandatoryAtMax 1
10
5025Monetary amount type code qualifierMandatoryID1/3Exact 1
20
5004Monetary amountOptDecimal1/35Exact 1
30
6345Currency identification codeOptAlphanumeric1/3Exact 1
40
6343Currency type code qualifierOptID1/3Exact 1
50
4405Status description codeOptID1/3Exact 1

Element Details

ID5025NameMonetary amount type code qualifierLength1/3Position10TypeIDRequirementMandatoryCodes
  • <>70
    [5488] amount of premium payable to the insurance company to insure the goods to the port or place of importation.
  • <>69
    (5488)+(5290) insurance and transport charges incurred outside a customs territory (or a customs union).
  • <>444
    The amount expected to be billed for a contract.
  • <>34
    A certain sum of money that must be kept in an account.
  • <>488
    Total charges which are not included in the transaction amount.
  • <>87
    The minimum amount that can be charged for a service or product.
  • <>400
    The amount of a rebate.
  • <>518
    The monetary amount is the debit balance at the starting date of the accounting period under review.
  • <>396
    The total value of all price subsidies.
  • <>194
    The total of costs for a die model.
  • <>127
    Tools, dies, moulds and similar items used in the production of the imported goods.
  • <>523
    The monetary amount is the total of credit balances at the starting date of the accounting period under review.
  • <>242
    Difference between initial amount and current amount.
  • <>361
    Accrued credit interest.
  • <>158
    (5488)+(5290) charges to be paid for moving goods, by whatever means, from the point of entry into the customs territory (within a customs union: to the point of entry in the final destination country).
  • <>206
    Additional amount (inspection costs) which is also covered under the documentary credit.
  • <>325
    Outstanding receivable payable amount of the account at the end of the reporting period.
  • <>163
    Wage tax share of total amount to be paid directly to tax collector.
  • <>419
    The best case estimated cost of the contract when it is complete.
  • <>337
    Indicates the amount of cleaning charges authorized which are not covered by insurance.
  • <>171
    Total amount of factored invoices and credit notes reassigned to the seller or to another factor.
  • <>236
    Amount which is used as the basis for price adjustment calculation.
  • <>135
    Total amount of freight costs payable to the carrier.
  • <>531
    Total rental amount for returnable packaging.
  • <>373
    Total amount of negative credit entries.
  • <>272
    The salary amount which is taxable.
  • <>348
    Booked amount on the account.
  • <>40
    [5032] amount declared for customs purposes of those goods in a consignment which are subject to the same customs procedure, and have the same tariff/statistical heading, country information and duty regime.
  • <>95
    No value has been declared for purposes of carriage.
  • <>474
    The amount for postage.
  • <>429
    Cumulative to date amount of actual costs.
  • <>430
    The cumulative to date value of costs earned as work is completed.
  • <>59
    Payments made for goods thus far.
  • <>497
    Total amount of goods and services excluding deposits for returnable goods.
  • <>301
    Total amount of outstanding invoices past due.
  • <>103
    Other charges deducted from the total invoice value.
  • <>507
    Net monetary amount paid or to be paid at intervals.
  • <>138
    Total of monetary discount amounts.
  • <>266
    Amount contributed net of any commission or other allowances .
  • <>345
    Cost information for providing the statement.
  • <>147
    The maximum increase or decrease in constituent material fluctuation which will not result in an item price renegotiation.
  • <>222
    Amount participating in the assessment basis of a contractual retention.
  • <>291
    The amount of inland freight incurred in delivering the goods to the place of export.
  • <>479
    The cumulative to date difference between the amount of work scheduled or planned (the budget) and the work completed (earned value) in cost terms.
  • <>98
    Original amount, without charges, allowances or adjustment.
  • <>10
    Indicates that the amount is based on the charged currency.
  • <>424
    Costs attributed to general and administrative activities.
  • <>54
    The fee charged for the provision of distribution services.
  • <>460
    Total debit related charges, not included in debit amount, not to be booked together with the debit amount.
  • <>261
    The amount as expressed in an alternate currency.
  • <>379
    The debit balance to be carried forward at closing date.
  • <>278
    The amount is for a non-compulsory contribution.
  • <>342
    Monetary amount which is not subject to taxation.
  • <>140
    The complete payment owed to one who has performed work for another.
  • <>225
    Total amount of works, including initial contract and variations.
  • <>296
    Total amount of authorised deductions.
  • <>17
    The complete quantity of anything needed for or made in one operation or lot.
  • <>423
    The cost of money applicable to a contract.
  • <>53
    The amount of discount that is due.
  • <>467
    The amount of tax that is paid by the insurer and not included in the premium.
  • <>490
    Amount to be paid in case of late delivery.
  • <>306
    Total amount of commission invoices paid.
  • <>104
    (5290) other charges paid for transport.
  • <>500
    Interest to pay because payment date of contribution solidarity fund was exceeded.
  • <>415
    The upper price limit on a contract.
  • <>65
    Total indirect amount of payments made to a seller or his agent instead of to a factor.
  • <>448
    Estimate of the total funds required for a contract.
  • <>451
    The cost difference between budget at completion and estimate at completion.
  • <>484
    Total debit-related charges, not yet inlcuded in credit amount, will be booked at the same time as the credit amount.
  • <>213
    Part of documentary credit amount subject to sight payment, deferred payment or acceptance when the documentary credit is available by mixed payment.
  • <>312
    Value per base unit.
  • <>110
    Fee incurring if item has been or will be picked up.
  • <>514
    The amount is for pre-advising only.
  • <>198
    The total of costs relating to tooling.
  • <>383
    Amount specified is the estimate cost.
  • <>181
    Highest possible value; not exceeding.
  • <>6
    The owing amount in the currency used as reference in the transaction.
  • <>257
    The amount that is being disputed.
  • <>356
    Deduction from the base value of an item for customs duty computation purposes.
  • <>154
    The monetary amount that is to be collected.
  • <>282
    Current amount of a number of amounts due on maintenance contract.
  • <>329
    Credit flow amount applying to an account.
  • <>21
    Cash discount given by the seller to the buyer.
  • <>443
    Cost value of contract funds authorized from the beginning of the contract or from a specific fiscal year through the current reporting period.
  • <>33
    The total amount of taxes to be collected.
  • <>80
    Licence fees relating to the imported goods that the buyer must pay, either directly or indirectly, as a condition of sale, to the extent that they are not included in the price actually paid or payable.
  • <>407
    The amount of revenue received in a year.
  • <>218
    An amount paid in advance for the purchase of stock.
  • <>319
    Amount to be paid to an insurer as a handling charge.
  • <>391
    The monetary amount which is used as an indemnity.
  • <>193
    The cost of raw material expressed per unit of measure.
  • <>388
    The total monetary amount which includes the value added tax (vat).
  • <>120
    Identifies the amount of sales tax payable.
  • <>524
    Code identifying the amount of a cost accounting entry.
  • <>245
    Difference between initial amount and provisional revised amount.
  • <>366
    The amount by which an amount is being rounded.
  • <>289
    Total amount of money that is part of a complete amount.
  • <>201
    The penalty charge incurred if or because conditions are not met.
  • <>322
    Outstanding payable amount of the account at the end of the reporting period.
  • <>164
    Social securities share of total amount to be paid directly to the social securities collector.
  • <>77
    [5068] total sum charged with respect to a single line item of an invoice.
  • <>36
    The amount is converted from another currency.
  • <>85
    The maximum amount that can be charged for a service or product.
  • <>402
    The total retail value of all products.
  • <>394
    The minimum monetary amount of an order or a contract which enables the payment of a fixed sum advance.
  • <>196
    The total cost of materials for an item, including components purchased externally.
  • <>125
    Amount on which a tax has to be applied.
  • <>521
    The monetary amount is the total of credit balances at the closing date of the accounting period under review.
  • <>240
    Amount in the initial contract which is not included in the calculation of the price adjustment.
  • <>8
    Total amount of allowance or charge.
  • <>363
    Amount of increase of the documentary credit.
  • <>259
    The total amount of all the charges.
  • <>358
    The closing balance of a consecutive statement.
  • <>204
    The amount of an allowance.
  • <>327
    Adjustment to debit flow amount.
  • <>161
    Amount of duty, tax or fee.
  • <>72
    Charges incurred within a customs territory (or a customs union).
  • <>446
    A forecast of the funds required for unauthorized work on a contract.
  • <>108
    Materials, components, parts and similar items incorporated in the imported goods.
  • <>133
    Total charges to be collected at destination.
  • <>537
    Total amount of bunker c or number 6 fuel oil on board when vessel arrives in port.
  • <>375
    Total amount of positive debit entries.
  • <>274
    The amount of the total value of a person's remuneration.
  • <>229
    Refund of deposit, due to partial or complete release of retention.
  • <>46
    [5020] allowable deductions from the price payable for calculating customs value.
  • <>472
    Amount paid toward the deductible amount.
  • <>93
    A negative amount of an item.
  • <>436
    The original cost value for a contract that all parties involved have negotiated and agreed to.
  • <>331
    The total collect charge based on weight.
  • <>177
    Total of all prepaid amounts within the message.
  • <>230
    Amount which is used as the basis for the calculation of the escalation.
  • <>268
    Specified contribution amount regularly paid before a change .
  • <>370
    Amount charged as state or province sales tax.
  • <>271
    The salary amount without special allowances or other cash benefits.
  • <>149
    A charge based on the value of goods or cargo.
  • <>43
    [5070] total amount for customs purposes of all goods in a consignment, whether or not they are subject to the same customs procedure, and have the same tariff/statistical heading, country information and duty regime.
  • <>96
    No value has been declared for customs purposes.
  • <>477
    Closing balance on the value date.
  • <>433
    The amount of adjustment made to cost variances when it is necessary to replan the remaining work on a contract.
  • <>334
    The total of prepaid other charges due to agent.
  • <>172
    The monetary amount that has been declared.
  • <>235
    Amount of variations which is not included in the calculation of the escalation.
  • <>499
    The total net monetary amount excluding value added tax (vat).
  • <>509
    The monetary amount of an allowance for each unit.
  • <>136
    (5140) amount to be added to the sum of invoice line amounts to arrive at the total invoice amount.
  • <>532
    Total amount of marine diesel oil (mdo) on board when vessel arrives in port.
  • <>340
    Indicates the net value of an original invoice after deduction or addition of all allowances or charges.
  • <>142
    Discount given to any purchaser at a particular commercial level e.g. at wholesale or retail level.
  • <>227
    Part of the amount of retention, not covered by guarantee of retention, and thus deducted from the amount paid to the contractor until release of retention.
  • <>294
    Unit charge per credit cover established.
  • <>48
    The whole amount of money that one entrusts for safekeeping.
  • <>15
    The addition of the balance all accounts divided by the number of accounts.
  • <>421
    The most likely estimated cost of the contract when it is complete.
  • <>438
    The initial upper price limit on a contract.
  • <>51
    Fee charged for the collection of disbursements.
  • <>465
    The premium net of all additions.
  • <>179
    Highest possible value; maximum.
  • <>492
    An allowance amount related to the financing of a debt.
  • <>304
    Miscellaneous charges.
  • <>106
    Cost for packing concerning labour and/or material.
  • <>502
    Amount of disbursement on which tax must be applied.
  • <>539
    Amount of adjustments to the valuation, e.g. price influence, royalties, assists, proceeds and commissions.
  • <>263
    Amount still remaining outstanding for payment.
  • <>453
    Limit of the agreed monetary amount debit line.
  • <>486
    Total debit-related charges, not yet included in credit amount, will not be booked together with the credit amount.
  • <>89
    Having a quantity of less than zero in an account.
  • <>211
    Amount of a debit note.
  • <>310
    Total amount of adjustments to credit notes.
  • <>112
    For an asset account, this would be when the account had a debit balance. for liability and owner's equity accounts, it would be when the account had a credit balance.
  • <>516
    The monetary amonunt is the debit balance at the closing date of the accounting period under review.
  • <>398
    The base amount on which a fixed sum advance is calculated.
  • <>381
    The amount specified is the budget cost.
  • <>183
    No further qualification of the amount.
  • <>129
    Part of the invoice amount which is subject to payment discount.
  • <>4
    Royalties relating to the imported goods that the buyer must pay, either directly or indirectly, as a condition of sale, to the extent that they are not included in the price actually paid or payable.
  • <>255
    Limit for new credit cover.
  • <>354
    Addition to the base value of an item for customs duty computation purposes.
  • <>156
    Amount out of total invoice amount being paid into a blocked account.
  • <>280
    Current amount of a number of due amounts if payment by instalment is agreed.
  • <>208
    Additional amount (interest) which is also covered under the documentary credit.
  • <>23
    The amount of money charged for the provision of a service or product.
  • <>417
    The estimated cost to complete the contract.
  • <>67
    Amount of insurance.
  • <>481
    Total credit-related allowances, not yet included in credit amount.
  • <>409
    The current cost value to which all parties have negotiated and agreed.
  • <>216
    An amount paid in advance for the purchase of building material.
  • <>317
    Amount due to an intermediary to be chargeable to an insurer for obtaining insurance business.
  • <>115
    Total of all prepaid taxes.
  • <>511
    The monetary amount of a charge for each unit.
  • <>386
    The maximum monetary amount which includes the value added tax (vat).
  • <>184
    The final cost of acquisition, net of all add-ons and discounts.
  • <>368
    Amount of sales tax applicable to the cost of materials.
  • <>3
    Third vat value if, for the same rate of vat, there are 3 different ways to set this value.
  • <>252
    Indication of actual share of the monetary amount for amortization.
  • <>353
    The total of the material costs of the repair of the equipment damage due to normal wear and tear.
  • <>151
    [5011] representation in figures of the total sum covered by an insurance for a particular shipment.
  • <>287
    Charge relating to fuel supplied.
  • <>24
    Code to indicate the total charges relating to a consignment.
  • <>410
    The estimated cost for work for which written authorization has been received, but the work has not been priced.
  • <>79
    The sum of all the line item amounts.
  • <>60
    The amount posted to an account, finally, after charges/allowances.
  • <>454
    Total debit related charges, not included in debit amount.
  • <>118
    The monetary value of a quota.
  • <>392
    The monetary amount which will be sub-contracted.
  • <>190
    The cost of setting up a prototype.
  • <>189
    The cost of packaging an item.
  • <>123
    [5218] value declared for statistical purposes of those goods in a consignment which have the same statistical heading.
  • <>527
    Discount for the purchase of a whole range of products.
  • <>246
    Amount of escalation and price adjustment.
  • <>365
    New amount of the documentary credit after an amendment.
  • <>202
    The amount of interest charged or paid on a debit or credit balance.
  • <>321
    Debit flow amount applying to an account.
  • <>167
    Difference between actual and calculated price.
  • <>29
    Collect charges payable in the currency of the country of destination.
  • <>74
    Amount which is to be paid before goods are delivered or the service is rendered.
  • <>440
    The adjusted upper price limit on a contract.
  • <>459
    Total debit related allowances, not included in debit amount, to be booked at the same time as the debit amount.
  • <>30
    This is the total amount that has to be collected from the consignee or other intermediary intervening party - including vat-.
  • <>83
    An agreed sum of money, which is paid in full at one time. this term is often used in connection with charter parties.
  • <>404
    To specify the amount of a budget.
  • <>377
    Expected amount of an entry.
  • <>276
    The total amount of wages paid during a year.
  • <>298
    Total amount offset against other items on the seller's or buyer's account.
  • <>44
    [5036] value, declared by the shipper or his agent solely for the purpose of varying the carrier's level of liability from that provided in the contract of carriage, in case of loss or damage to goods or delayed delivery.
  • <>470
    The cumulative cost, excluding any fee or profit, applicable to defined contract changes that have occurred since the beginning of the contract and have been negotiated and agreed to.
  • <>91
    The end-of-the-period total amount which is left after recording appropriate adjusting entries.
  • <>19
    Commission paid by the importer to his/her agent for the service of representing him/her in the purchase.
  • <>434
    The amount of adjustments made to a budget baseline when it is necessary to replan the remaining work on a contract.
  • <>469
    The variable contribution required to be paid by the insured person.
  • <>333
    The total of collect other charges due to carrier.
  • <>175
    An amount in addition to the total message value.
  • <>232
    Amount of variations which is used as the basis for the calculation of the escalation.
  • <>308
    Total amount of credit notes.
  • <>131
    The amount specified is the total of all charges/allowances.
  • <>535
    Total amount of intermediate fuel oil (ifo) taken on in the port.
  • <>349
    Pending amount to be booked on the account.
  • <>41
    Goods value assigned by customs.
  • <>94
    No amount of insurance has been declared for a consignment.
  • <>475
    Amount which has been debited earlier.
  • <>428
    The cumulative to date cost of planned work.
  • <>431
    The difference between the actual cost incurred to complete work and the budget cost of the work completed (earned value) for a given reporting period.
  • <>58
    The amount of a fee.
  • <>336
    The total prepaid valuation charge.
  • <>170
    The monetary value stated within a related document.
  • <>237
    Amount in the initial contract which is used as the basis for the price adjustment calculation.
  • <>134
    The total value of declared amounts.
  • <>530
    The monetary amount being reimbursed.
  • <>372
    The transfer amount of a direct debit.
  • <>273
    Salary used for superannuation benefit/contribution purposes .
  • <>13
    The amount is subject to a total monetary discount.
  • <>427
    The budget baseline amount against which performance is measured.
  • <>57
    This amount is equivalent to the amount to be transferred, but in another currency.
  • <>463
    Fee for dispensing.
  • <>339
    Indicates the gross total value of an original invoice.
  • <>238
    Amount of variations which is used as the basis for price adjustment calculation.
  • <>494
    The amount which has been incurred.
  • <>302
    Total amount of disputed invoices/credit notes.
  • <>100
    Code to indicate that certain charges accrue to an agent.
  • <>504
    Amount paid on a daily basis.
  • <>265
    Amount of any commission.
  • <>540
    An allowance made in the value to the extent of the damage or defect.
  • <>346
    The total of all credit items reported.
  • <>144
    (5290) cost incurred by shipper in moving goods, by whatever means, from one place to another under the terms of the contract of carriage, see un/ece recommendation no 23. synonym: freight charges (customs).
  • <>221
    Amount not participating in the assessment basis of a guarantee retention.
  • <>292
    The amount of any concession. to allow the nomination of the difference between the amount of duty plus tax paid and the amount that would have been payable without an end-use security being applied.
  • <>16
    The fee that a bank charges for releasing monies.
  • <>422
    The budget base cost for a contract.
  • <>52
    (5014) the amount specified is the discount amount.
  • <>466
    The amount of engineering fees.
  • <>491
    A charge amount related to the financing of a debt.
  • <>307
    Total amount of invoices for miscellaneous charges paid.
  • <>105
    Other valuation charges which are payable by reason of the importation or sale of the goods in the customs territory.
  • <>501
    Interest to pay because payment date of employee's additional contribution is exceeded.
  • <>260
    The total amount of all the allowances.
  • <>378
    The credit balance to be carried forward at closing date.
  • <>279
    First of a number of due amounts if payment by instalment is agreed.
  • <>343
    The closing balance is the last balance for a reporting period.
  • <>141
    Identifies the value of cost, insurance and freight. (refer to icc incoterm cif for an expanded definition).
  • <>224
    Total amount of contract variations, not including the amount planned on initial contract.
  • <>297
    Total amount charged back to the seller.
  • <>384
    Amount specified is the earned value cost.
  • <>186
    The cost of materials needed to complete a task.
  • <>528
    The amount used as the basis for calculation excludes all taxes.
  • <>249
    Amount of valuation.
  • <>1
    First vat value if, for the same rate of vat, there are 1 to 3 different ways to set this value.
  • <>250
    Deduction of amounts directly paid to subcontractors.
  • <>351
    Amount of labour rate per hour.
  • <>153
    A charge based on the weight of goods or cargo.
  • <>285
    Allowance given as a manufacturer's bonus.
  • <>168
    A sub total of tax values.
  • <>26
    The fee a party charges for collecting charges.
  • <>412
    The incentive fee amount that will apply if the contract target is met.
  • <>62
    Total unallocated amount of payments received by a factor.
  • <>456
    Total debit related charges, included in debit amount.
  • <>483
    Total credit-related allowances, already included in credit amount.
  • <>214
    Amount paid to the contractor at the beginning of works in the construction to be deducted later.
  • <>315
    The amount of the opening balance.
  • <>117
    Discount given for purchase of goods in bulk.
  • <>513
    The amount of the dossier.
  • <>244
    Difference between initial amount and revised amount.
  • <>367
    Amount of sales tax applicable to the cost of labour.
  • <>288
    The charge relating to the normal supply of vehicle registration plates.
  • <>200
    The minimum amount that must be paid on an amount now due for payment.
  • <>323
    Outstanding payable amount of the account at the beginning of the reporting period.
  • <>165
    Amount being the balance of the amount to be adjusted and the adjusted amount.
  • <>76
    To put left over money in something offering profitable returns.
  • <>442
    Recorded or incurred expenditures.
  • <>32
    The total of other charges that are due to the agent.
  • <>81
    Cost incurred by loading and handling.
  • <>406
    The maximum amount without the addition of a value added tax.
  • <>219
    The cost of stock less any monies paid in advance.
  • <>318
    Insurance tax amount on insurance premium and fees.
  • <>390
    The minimum monetary amount which excludes the value added tax (vat).
  • <>192
    The cost of raw material expressed per cart.
  • <>389
    The monetary amount which excludes the value added tax (vat).
  • <>121
    The cost of transportation in domestic currency.
  • <>525
    The monetary amount represents the tariff.
  • <>207
    Additional amount (insurance costs) which is also covered under the documentary credit.
  • <>324
    Outstanding receivable amount of the account at the beginning of the reporting period.
  • <>162
    Amount which can be deducted from the stated invoice price where that price includes the customs duty amount.
  • <>418
    The estimated cost of the contract when it is complete.
  • <>71
    (5488) insurance charges incurred outside a customs territory (or a customs union).
  • <>68
    (5488)+(5290) sum total of transport and insurance charges (ccc).
  • <>445
    The estimate of the costs that would be incurred to liquidate all obligations if the contract were to be terminated.
  • <>35
    The cost of providing a container.
  • <>489
    Total allowances which are not included in the transaction amount.
  • <>86
    The total of all monetary amounts contained within the message.
  • <>401
    Amount used as the basis to calculate a penalty.
  • <>519
    The monetary amount is the credit balance at the starting date of the accounting period under review.
  • <>397
    Amount related to advertising.
  • <>195
    The total of costs for a gauge.
  • <>126
    Amount that has to be collected.
  • <>522
    The monetary amount is the total of debit balances at the starting date of the accounting period under review.
  • <>243
    Difference between initial amount and provisional current amount.
  • <>360
    Accrued debit interest.
  • <>159
    Amount in the currency of the licence to be written off from the total licence value.
  • <>47
    Fees incurred by delivery.
  • <>473
    The amount of the deductible remaining.
  • <>92
    The payments left over after deductions or allowances have been made.
  • <>437
    The initial negotiated contract costs, plus profit or incentive fees, paid for meeting contract target objectives.
  • <>330
    The total of prepaid other charges due to carrier.
  • <>176
    Total of all duty/tax/fee amounts.
  • <>231
    Amount in the initial contract which is used as the basis for the calculation of the escalation.
  • <>109
    Discount for paying early.
  • <>132
    Total charges to be collected.
  • <>536
    Total amount of bunker c, or number 6 fuel oil on board when vessel arrives in port.
  • <>374
    Total amount of positive credit entries.
  • <>275
    The amount of other salary or allowances in addition to a base salary.
  • <>228
    Refund of deposit, due to an increase of the guarantee of retention amount, or a decrease of the amount of retention.
  • <>11
    Amount that has been paid.
  • <>425
    Budget cost not assigned or distributed to contract activities.
  • <>55
    The amount of duty.
  • <>461
    Total debit related allowances, not included in debit amount, not to be booked together with the debit amount.
  • <>496
    Total deposit amount for returnable packaging.
  • <>300
    Closing balance of the account to be carried forward to the next accounting period.
  • <>102
    Other commissions paid by the importer to his/her agent in relation to the goods being imported.
  • <>506
    Gross monetary amount paid or to be paid at intervals.
  • <>139
    A complete charge for goods or services rendered.
  • <>267
    Specified contribution amount regularly paid.
  • <>344
    This is the balance on value date.
  • <>146
    (5110) reporting monetary amount is a "per unit" amount.
  • <>223
    Total amount of works in the initial contract.
  • <>290
    The export value calculated for the purposes of assessing dumping duty.
  • <>478
    The difference between the amount of work scheduled or planned (the budget) and the work completed (earned value) in cost terms for a given reporting period.
  • <>99
    Code to indicate charges levied at destination.
  • <>420
    The worst case estimated cost of the contract when it is complete.
  • <>439
    The adjusted negotiated contract cost plus target or incentive fees paid for meeting contract target objectives.
  • <>50
    Amount of disbursements to be collected by the carrier according to the order given by the shipper.
  • <>464
    The total premium including all commission and fees but excluding external taxes.
  • <>178
    Specific amount.
  • <>493
    The amount charged because of a cancellation.
  • <>305
    Amount of money remitted.
  • <>107
    [5448] costs incurred for all containers and coverings of whatever nature which are considered as being one for customs purposes with the goods, and the cost of packing whether for labour or material.
  • <>503
    [5060] total value of a contract.
  • <>538
    The value of the commodity for the purposes of a government agency valuation.
  • <>262
    Amount paid or due for a single instalment of an instalment payment scheme.
  • <>341
    Indicates the value of an offset.
  • <>143
    The amount which has been transferred from buyer to the sellers bank.
  • <>226
    The amount of money that has been or is to be retained.
  • <>295
    Unit charge per unused credit cover.
  • <>49
    Value of engineering, development, artwork, design work and plans and sketches carried out elsewhere than in the customs territory and necessary for the production of the imported goods.
  • <>14
    The amount in the currency in which the amount is paid or has to be paid.
  • <>7
    Charges which parties agreed upon.
  • <>256
    Credit cover for an individual order or shipment.
  • <>357
    The opening balance of a consecutive statement.
  • <>155
    Standard customs duty that would apply if special provisions did not apply.
  • <>283
    Current amount of a number of amounts due on lease contracts.
  • <>328
    Adjustment to a credit flow amount.
  • <>20
    Value of data contained on the carrier media (e.g. magnetic tape).
  • <>414
    The estimated final contract price based on the most likely estimate of cost at completion.
  • <>64
    Amount to be paid for moving goods, by whatever means, from one place to another, inclusive discounts, allowances, rebates, adjustment factors and additional cost relating to freight costs (un/ece recommendation no 23).
  • <>449
    Amount of contract funds carried forward.
  • <>450
    Estimate of net funds required for a contract based on total funding requirements less any funds carried over from a previous year.
  • <>39
    [5214] amount, debited by the seller and being the total of related article item amounts in a commercial invoice.
  • <>485
    Total credit-related allowances, not yet included in credit amount, will be booked at the same time as the credit amount.
  • <>212
    Amount of the documentary credit.
  • <>313
    The amount of freight paid for moving goods between place of export and place of import.
  • <>111
    Having a quantity of greater than zero in an account.
  • <>515
    The monetary amount represents the price of extra cost to pay in addition to the normal price.
  • <>199
    The monetary limitation amount for a delivery.
  • <>382
    The amount specified is the actual cost.
  • <>180
    Highest possible value; up to.
  • <>25
    The amount specified is the basis for calculation of charges/allowance.
  • <>411
    The profit that will be realised if a contract target is met.
  • <>78
    The charges incurred in landing the goods into store in the country of importation, excluding customs duties and taxes.
  • <>61
    The status of funds in the process of collection.
  • <>455
    Total debit related allowances, not included in debit amount.
  • <>480
    Total debit-related charges, not yet included in credit amount.
  • <>408
    The commission paid to the lead insurer for co- insurance.
  • <>217
    The cost of building material less any monies paid in advance.
  • <>316
    Premium amount including commission without insurance tax and fees.
  • <>114
    Total of all prepaid charges.
  • <>510
    The amount still available within the limit of the overdraft.
  • <>387
    The minimum monetary amount which includes the value added tax (vat).
  • <>185
    The cost of providing labour to complete a task.
  • <>2
    Second vat value if, for the same rate of vat, there are 2 or 3 different ways to set this value.
  • <>369
    Amount charged as tax on goods and services.
  • <>253
    Indication of actual cumulated monetary amount of previous and actual amortization order amount.
  • <>352
    The total amount of the labour costs of the repair of the equipment damage due to normal wear and tear.
  • <>150
    [5490] amount in national currency resulting from the application, at the appropriate rate, of value added tax (or similar tax) to the invoice amount subject to such tax.
  • <>286
    Charge made for an administration activity.
  • <>73
    Total amount of payments booked to the collateral account.
  • <>447
    A forecast of the funds required for additional work on a contract.
  • <>37
    Credit deducted from the total invoice amount for the value of goods not included in a consignment but included in the invoice.
  • <>84
    Value of materials consumed in the production of the imported goods.
  • <>403
    To specify an exempted amount.
  • <>395
    An amount refunded by a vending machine as change in a purchase.
  • <>197
    The total cost of components purchased externally.
  • <>124
    Tax imposed by government or other official authority related to the weight/volume charge or valuation charge.
  • <>520
    The monetary amount is the total of debit balances at the closing date of the accounting period under review.
  • <>241
    Amount of variations which is not included in the calculation of the price adjustment.
  • <>9
    Amount to be paid.
  • <>362
    The amount is contained within the booked amount.
  • <>258
    The stated charge amount is only for information. the amount will be debited due to agreement.
  • <>359
    Balance to be confirmed for audit reasons.
  • <>205
    Additional amount (freight costs) which is also covered under the documentary credit.
  • <>326
    Position amount of the assets and liabilities at reporting date.
  • <>160
    (5346) costs, other than packing, freight and insurance costs, specified separately.
  • <>435
    The cost of the budget at the completion of a contract or project.
  • <>468
    The fixed contribution required to be paid by the insured person.
  • <>332
    The total prepaid charge based on weight.
  • <>174
    [5190] opening balance of the account brought forward from the prior accounting period.
  • <>233
    Amount which is not included in the calculation of the escalation.
  • <>309
    Total amount of adjustments to invoices.
  • <>130
    Total amount of charges payable to the carrier.
  • <>534
    Total amount of intermediate fuel oil (ifo) on board when vessel arrives in port.
  • <>376
    Amount concerning an accounting entry.
  • <>277
    Sum of individual contributions.
  • <>299
    Total amount to be treated as special booking entry by the beneficiary.
  • <>ZZZ
    Mutually defined monetary amount.
  • <>45
    Charges (e.g. construction, assembly, erection, maintenance or technical assistance) after importation, which are included in the total invoice price, that may be deducted to arrive at a customs value.
  • <>471
    Amount that is, or will be pre-invoiced.
  • <>90
    For an asset account, this would be when the account had a credit balance. for liability and owner's equity accounts, it would be when the account had a debit balance.
  • <>18
    Fee charged by a broker for acting on behalf of a third party.
  • <>432
    The cumulative to date difference between the actual cost incurred to complete work and the budget cost of the work completed (earned value) for a given reporting period.
  • <>335
    The total collect valuation charge.
  • <>173
    Lowest possible value; minimum.
  • <>234
    Amount in the initial contract which is not included in the calculation of the escalation.
  • <>498
    The monetary amount which is used as an indemnity for waiting.
  • <>508
    Value of product returned by the customer.
  • <>137
    Indicates the amount of damage coverage provided under the damage protection plan (dpp).
  • <>533
    Total amount of marine diesel oil (mdo) taken on in the port.
  • <>269
    Difference from a nominated amount.
  • <>371
    The exact amount payable after any adjustments.
  • <>270
    A salary amount specified for a particular category of employees.
  • <>148
    Total amount paid under guarantee, such as under a factor's guarantee.
  • <>42
    Total allocated amount of cash payments received by a factor.
  • <>97
    [5210] total monetary amount of a quotation.
  • <>476
    Opening balance on the value date.
  • <>462
    The annual turnover.
  • <>338
    Indicates the escalated value derived by application of an escalation factor to an original monetary value.
  • <>239
    Amount which is not included in the calculation of the price adjustment.
  • <>495
    Interest amount accrued through overdraft.
  • <>303
    Amount of commission invoices.
  • <>101
    Code to indicate that certain charges accrue to a carrier.
  • <>505
    The amount to be paid for the right to use a place, product or service.
  • <>264
    Gross amount contributed. this may include commissions or allowances.
  • <>541
    Charges relating to the air transport of the goods which represent the freight charges only (i.e. not including the handling charges, agency fees etc.).
  • <>347
    The total of all debit items reported.
  • <>145
    (5290) transport charges incurred outside a customs territory (or a customs union).
  • <>220
    Amount participating in the assessment basis of a guarantee retention.
  • <>293
    Invoice amount charged back to seller.
  • <>12
    Amount which was remitted (see remittance advice).
  • <>426
    Amount of the contract budget withheld for management purposes.
  • <>56
    The amount specified is the basis for duty/tax or fee.
  • <>209
    Amount which has to be paid to an agent.
  • <>22
    [5017] monetary amount to be paid at time of delivery.
  • <>416
    The estimated upper price limit on a contract.
  • <>66
    Net price x quantity for the line item.
  • <>452
    The value of a mixture, composite, or set as defined by the harmonized tariff schedule general rules of interpretation 3(b) or 3(c).
  • <>487
    Total credit-related allowances, not yet included in credit amount, will not be booked together with the credit amount.
  • <>88
    Amount giving the basis for national preference calculation.
  • <>210
    Amount of a credit note.
  • <>311
    Total amount of adjustments to payments.
  • <>113
    (5302) amount which has been prepaid in advance.
  • <>517
    The monetary amount is the credit balance at the closing date of the accounting period under review.
  • <>399
    The monetary amount which may be advanced on a payment.
  • <>380
    Total amount of negative debit entries.
  • <>182
    Any further qualification of the amount.
  • <>128
    The amount specified is the total amount.
  • <>5
    The amount specified is the adjusted amount.
  • <>254
    Limit for current credit cover.
  • <>355
    The value is pro-ratable.
  • <>157
    (5010) value for which the goods are insured.
  • <>281
    Last of a number of due amounts if payment by instalment is agreed.
  • <>27
    Collect charges payable in the currency of the country of destination.
  • <>413
    The negotiated contract cost, plus profit or incentive fees paid for meeting contract target objectives.
  • <>63
    Identifies the value of the shipment free on board, named port of shipment (see fob incoterm of icc).
  • <>457
    Total debit related allowances, included in debit amount.
  • <>482
    Total debit-related charges, already included in credit amount.
  • <>215
    Progressive deduction of advance payment, as works go on.
  • <>314
    Amount for own credit risk, not covered by credit cover.
  • <>116
    The cost of buying goods or services.
  • <>512
    Limit of the agreed monetary amount credit line.
  • <>385
    The amount of repair covered under warranty.
  • <>187
    Non specific costs for an item in addition to those stated explicitly.
  • <>529
    The amount, used as the basis for calculation, which includes all taxes except value added tax (vat).
  • <>248
    Retention on a basis contractually fixed.
  • <>251
    Indication of final monetary amount for amortization.
  • <>350
    Cost incurred by repair of the damage.
  • <>152
    Value of any part of the proceeds of any subsequent resale, disposal or use of the imported goods that accrues, directly or indirectly, to the seller.
  • <>284
    The amount of work calculated on the basis of manpower time and supply cost.
  • <>169
    The total amount as expressed in an alternate currency.
  • <>75
    Registered amount of equity of a company.
  • <>441
    Estimated obligations to vendors.
  • <>458
    Total debit related charges, not included in debit amount, to be booked at the same time as the debit amount.
  • <>31
    For legal accounting reasons the amount without vat has to be announced, together with the amount of vat.
  • <>82
    The complete amount of funds that customers mailed in to a specific location. often times funds are sent to a post-office lock box in their city.
  • <>405
    To specify the monetary amount for which services remain to be carried out.
  • <>119
    The amount is what the bank received, and the one before charges/allowances.
  • <>393
    Monetary amount due for work completed during a specified time period.
  • <>191
    Amount of money authorized for cleaning services.
  • <>188
    The cost of overhead when completing a task.
  • <>122
    Amount that the consignor agrees to be invoiced or to pay. this amount is part of the total charges applied to the consignment.
  • <>526
    A discount for reaching or exceeding an agreed volume.
  • <>247
    Provisional amount of escalation and price adjustment.
  • <>364
    Amount of decrease of the documentary credit.
  • <>203
    Goods item total minus allowances plus charges for line item. see also code 66.
  • <>320
    Amount to be paid to an intermediary as a handling fee.
  • <>166
    Amount of the guarantee placed with customs.
  • <>28
    A summary total of collection charges.