<>70
Date added to a period of time.
<>69
[2139] date and optionally time by which the merchandise should be delivered to the buyer, as agreed between the seller and the buyer (generic term).
<>646
Date when trade style was registered.
<>444
Date of approval.
<>488
Date when a period of benefit begins.
<>87
Time elapsing between the arrival of a travel service and the departure of a connecting travel service.
<>602
Date of citizenship change.
<>400
Ultimate date/time at which goods or equipment should be released.
<>518
Date and or time when a period of care starts.
<>396
Date/time on which equipment is requested to be positioned (delivered).
<>194
Date/time on which a period starts.
<>590
Date when resolved.
<>589
Date of last activity.
<>127
Date of the previous report.
<>765
The calendar year of the season in which the trade item is available.
<>523
Date and or time when a prescription was issued.
<>242
Date and/or time that the document was prepared.
<>361
[2497] indication that freshness of goods is limited in time to the date shown.
<>158
The first date of a period forming a horizon.
<>567
Period covered by the report.
<>206
Date/time on which a period (from - to) ends.
<>325
Period a tax rate/tax amount etc. is applicable.
<>163
Date/time when a specific process starts.
<>721
Date when the information was authorized to be released.
<>419
A period for which a forecast applies.
<>575
Date of actual construction.
<>337
Date when a person leaves an employer.
<>171
Date/time on which the reference was issued.
<>733
Date on which accounts were last filed at the public register.
<>236
Date/time at which the intake of materials, to be carried to improve the trim and the stability of the means of transport, was completed.
<>698
Estimated start date of employment in a particular position.
<>708
The date of the first visit by a patient to a healthcare provider for this condition.
<>135
Date identifying when a telex message was sent.
<>777
Date/ time that the conveyance arrives at the initial port in the country of destination.
<>531
A period of time in which a payment has been or will be made.
<>373
Date and time of mooring.
<>272
The specification of the period of time, expressed in number of days, after the date of issuance of the transport document(s) within which the documents must be presented.
<>348
Date on which packing commenced.
<>40
Date and/or time when clinical information is issued.
<>95
Date as specified on the bill of lading.
<>474
The mandatory date or time for finishing.
<>632
Period of lowest activity.
<>429
The period coverage has been in force.
<>676
Period of time that was worked for the company.
<>430
Date from which the anniversary coverage is measured.
<>59
Inland movement authorization date.
<>695
Date when an item may be mailed.
<>497
To identify the period for which the definition of disability applies.
<>301
Date of validity of index values.
<>103
Date/time on which delivering period for breakbulk storo cargo ends (storo = stowing on roll on-roll off vessel).
<>705
The period of time an event is late due to the actions of a customer.
<>507
The date on which negotiations started.
<>138
[2035] date that an amount due becomes available to a creditor under the terms of payment.
<>266
The date on which something was made valid, ratified or confirmed.
<>741
Period of time a receivership lasts.
<>543
Date of the latest balance sheet.
<>345
Week days of operation.
<>147
[2079] date on which an export licence expires.
<>222
Latest date for presentation of a document.
<>291
The date/time for which something is planned to begin or commence.
<>479
The scheduled date or time for completion.
<>98
Date/time at which the winter time starts.
<>10
Date on which goods should be shipped or despatched by the supplier.
<>662
The average period of time over which money has been paid.
<>424
The last date on which ordering may take place.
<>54
Time at the seller's location.
<>460
Date when a period of wage begins.
<>578
Date of the meeting.
<>626
Date when inactivity ends.
<>261
Date/time assigned to identify the release of a set of rules, conditions, conventions, productions, etc.
<>379
The date on which a periodic inspection has to take place.
<>278
Lead time is the defined timespan.
<>746
The period for extraction of records.
<>544
Date of the security share price.
<>342
[2347] date and optionally time when a consignment is to be or has been loaded onto a means of transport.
<>140
Date/time at which funds should be made available.
<>225
Date/time at which the carrier proceeds to the weighting of the goods.
<>296
Date/time on which the retention is released.
<>638
Date when current legal structure became effective.
<>17
Date and/or time when the shipper of the goods expects delivery will take place.
<>665
The start date of a period in which employees were temporarily placed out of work.
<>423
The first date on which ordering may take place.
<>53
Time at the buyer's location.
<>467
A date or period that is a break from work.
<>621
Estimated date of construction.
<>739
Date education begins at an educational institution.
<>692
The date an over target baseline was implemented for a project.
<>490
Date when a period of selection begins.
<>306
Period of execution of works.
<>104
Date/time on which delivering period for container roll on-roll off (ro-ro) cargo ends.
<>702
The period of time between changes.
<>500
Date on which the equipment was surveyed at the end of the current leasing period.
<>617
Date when again open.
<>415
The date applicable to the activity being reported.
<>65
The first scheduled date/time for delivery.
<>448
Creation date of referenced item.
<>653
The date when an investigation began.
<>451
Date source document data is entered into a business application.
<>38
Date/time by which the goods should have been shipped.
<>686
The last date, and/or time, and/or period a product was sold.
<>484
Date when a person is expected to recover from illness.
<>213
Calculation is based on year of 365-6 days, month of 30 days.
<>312
Shipment(s) of goods is/are to be made not before the first specified date/time and not after the second specified date/time.
<>110
The date on which the shipment of goods was originally scheduled.
<>716
To identify the qualification age for lifetime benefits provided to the insured in the event of sickness.
<>514
Actual date when adoption occurs.
<>198
Last of a number of days allowed in a charter party for the loading and discharging of cargo.
<>383
Cancel the order if goods not shipped by this date.
<>181
Date/time when equipment is positioned.
<>787
Date that the item was originally manufactured.
<>585
Period preceding current period.
<>769
The date and/or time until which the minimum buying quantity may be purchased.
<>752
Date on which the next reading of a meter is scheduled to take place.
<>550
Start date of the lease term.
<>6
The date an entity moved from a location.
<>257
[2253] date on which the calculation was made.
<>356
The date, and or time, and or period on which a sale took place.
<>154
The date on which a document was accepted.
<>282
Lead time is referenced to the date of confirmation.
<>329
[2491] date on which an individual is or was born.
<>21
The date/time of the charge back.
<>641
Date of resignation.
<>443
Date the item was directly interchanged.
<>658
The time period covered in a comparison.
<>80
The actual date and/or time the planning ended.
<>605
Date when the board of directors was registered.
<>407
Date/time on which the document is requested by a party.
<>218
The date/time of authentication and/or validation.
<>319
Date at which funds are taken into account for interest calculation (in debit or credit).
<>597
Date when registered.
<>391
Lead time to determine the date an item will be approved based on the date the item was received.
<>193
The date when ordered bank initiated the transaction.
<>388
The date when an order amendment becomes binding for both parties.
<>120
The last date from which interest is borne.
<>762
The date and or time suggested for the marketing campaign to end.
<>524
Date and or time when a prescription was dispensed.
<>759
The latest date/time that the trade item can be shipped.
<>245
Year in which the treaty was commenced.
<>366
Date on which a inventory report is made.
<>289
Validity period of the interest rate.
<>560
Date evaluation takes place.
<>201
Date/time at which the equipment is picked up.
<>322
A period of time for the recording of financial transactions for accounting.
<>164
Date/time when a specific process ends.
<>726
The date the last x-ray was taken.
<>77
Date of revision to a specification.
<>36
Date of expiry of the validity of a referenced document, price information or any other referenced data element with a limited validity period.
<>688
As at this date no valid shipping schedule has been established.
<>85
Shipment might take place latest at given date.
<>600
As of this date the board of directors is not fully filled.
<>402
Date/time on which the document was actually received.
<>718
The period of time the insured must be disabled in the event of sickness for benefits to be payable by the ceding company.
<>394
Date/time on which equipment was actually positioned (delivered).
<>196
Date/time of earliest departure of means of transport.
<>592
The estimated date of birth.
<>789
The number of days the trade item that has been opened can remain on the shelf before it must be removed.
<>125
[2293] date of issue of an import licence.
<>767
Most recent date and/or time that the information has been changed.
<>521
Date and or time of discharge from a department.
<>240
To identify a reinsurance account period via start and end dates.
<>8
Date/time when the purchase order is received by the seller.
<>363
A period indicating the total shelf life of a product.
<>259
Date when a vessel, vehicle or other means of transport was registered by a competent authority.
<>358
Scheduled for delivery on or after the specified date, and or time.
<>565
Date when bankruptcy was filed.
<>204
Date on which customs releases merchandise to the carrier or importer.
<>327
Date on which an instalment payment is due.
<>161
Date the customer authorised the goods' release.
<>723
The date when last seen.
<>619
Date when deed was not available.
<>72
Delivery might take place earliest at given date.
<>644
Date when social security claims were verified.
<>446
The date the estimate was revised.
<>108
An official mark stamped on a letter identifying date/time of dispatch or arrival.
<>133
Date/time when carrier estimates that a means of transport should depart at the place of departure.
<>771
The date at which the data is released.
<>537
Date the international review cycle starts.
<>375
Date of first registration.
<>274
Lead time is the defined timespan.
<>548
Date work stopped or will stop.
<>229
The date and/or time hoses were connected.
<>46
Date on which a document or message has been cancelled.
<>472
The latest date or time for finishing.
<>93
Date when a contract expires.
<>634
Date when current name became effective.
<>669
The period of time for which financial coverage applies.
<>670
The date on which a claim was made.
<>436
The date up to which the reinsurance has been paid.
<>573
The start date of employment in a particular position.
<>331
Date/time when contributions cease.
<>177
The information must be advised on the date/time indicated.
<>735
Number of hour's offset from coordinated universal time (utc).
<>230
The date and/or time hoses were disconnected.
<>268
The time to go over a distance.
<>370
The date on which foreign-built container equipment has entered into the commerce of another country and has become domestic equipment.
<>271
Date on or about which goods should be shipped.
<>149
Date required for invoice issue.
<>43
The intended duration of an event.
<>96
Date/time when goods should, might or have been discharged from the means of transport.
<>477
The estimated date or time for completion.
<>631
Date of liquidation.
<>675
The date on which a decision from a court of law was rendered.
<>433
The period for which reinsurance coverage has been in force.
<>576
Start date of employment in a particular profession.
<>628
Date of last capital change.
<>334
Date/time when a status changes.
<>172
Date from which an item has been or will be hired.
<>730
The period of time that the orthodontic treatment has remaining.
<>235
In relation with the arrangements agreed between buyer and seller or between sender and main transport it may be necessary to specify the latest collection date/time.
<>499
To identify the period of the premium change.
<>136
[2281] date and or time of the departure of a means of transport.
<>774
The actual date and/or time when the end of the handling action takes place.
<>532
The average delay between deliveries.
<>340
Date/time when a person joins a fund.
<>142
The date a labour wage is determined.
<>227
Date on which funds should be made available to the beneficiary's bank.
<>294
Date/time on which hand over (i.e. the transfer of responsibility for an object or activity such as documentation, system etc. from one party to another) is planned to take place.
<>48
Duration.
<>15
Date/time when promotion activities begin.
<>667
The date when something was retracted.
<>421
To estimate the date of acceptance.
<>438
The period of time the insured must be disabled before reinsurance coverage becomes effective.
<>51
First date for accumulation of delivery quantities.
<>465
Date and time at which crew and/or passengers disembark.
<>623
Date when graduation occurs.
<>179
Date at which the booking was made.
<>690
The average period of time that credit is extended by suppliers.
<>492
The date/time/period of a balance.
<>304
Value date of indexes appearing as numerators in a price adjustment formula.
<>106
Date/time on which delivering period for container roll on-roll off (ro-ro) cargo starts.
<>700
Date when ownership changes.
<>502
Date on which the equipment was surveyed at the beginning of the current leasing period.
<>539
Date a status was assigned.
<>263
Period for which an invoice is issued.
<>744
The date that an investment number was allocated.
<>546
Date opened for business.
<>648
Date when the trial actually started.
<>651
The date when an investigation ended.
<>453
The date of the source document.
<>684
The date on which deletion occurs.
<>486
Date when a period of illness ends.
<>89
The date on which an inquiry is made.
<>211
Calculation is based on year of 360 days, month of 30 days.
<>310
Date/time of receipt.
<>112
The first date from which interest is borne.
<>714
To identify the period of time for which benefits are provided in the event of sickness.
<>516
Date and or time of admission to a hospital.
<>398
Date/time at which goods can be picked up, according to a planning.
<>381
The total lifespan of a product at the time of its production.
<>183
Date related to a given context.
<>785
The date/time at which the government service is requested to be executed.
<>587
Date of action.
<>129
[2043] date when the imported vessel/merchandise last left the country of export for the country of import.
<>750
The specified before date.
<>552
Actual date of start.
<>4
[2011] date of order.
<>255
Date when ordered items should be available at a specified location.
<>354
A specific date range associated with an activity.
<>156
The last date of an accounting period.
<>280
Lead time is the defined timespan.
<>569
Date of renewal.
<>208
Date/time at which a means of transport has to depart ultimately.
<>23
Actual date/time of the reconditioning of a piece of equipment.
<>615
Date when annual report was considered delinquent.
<>417
Date/time at which the previous booking was made.
<>67
Delivery date deriving from actual schedule.
<>683
The period for which something is suspended.
<>481
The not after date or time for starting.
<>409
Date/time on which the order should be completed at the latest.
<>216
Calculation is based on year of 365 days, month of 30 days.
<>317
The date to answer or to respond in word or action.
<>115
Date as of a sample will be available seller defined.
<>713
To identify the qualification age for lifetime benefits provided to the insured in the event of an accident.
<>511
The time limit in which an event must take place.
<>599
As of this date the board of directors is not authorised.
<>386
Date/time when a payment is cancelled due to an administrative error.
<>184
Date/time of notification.
<>782
Date/time at which an inspection begins.
<>580
Date after which no claim can be filed.
<>757
Date/time of the departure of the goods from the place of loading.
<>555
Date of return to work.
<>368
Date on which the latest reading of a meter took place.
<>3
[2377] date of issue of an invoice.
<>252
Date/time that the conveyance arrives at the initial port in the country of destination.
<>353
Date to which an accounting transaction refers.
<>151
Date on which goods are imported, as determined by the governing customs administration.
<>287
Date/time on which the contract is awarded to a tenderer.
<>728
The date something is placed.
<>24
Date and time when a transfer note (transfer document for transport exclusively using containers as equipment) is recognised as being valid by the carrier.
<>612
Date of the asset and liability schedule.
<>410
Ultimate date/time on which a piece of equipment must be repaired.
<>79
Shipment might happen at given date/time.
<>60
Date the engineering level of goods is changed.
<>656
Length of time that a person or animal has lived or a thing has existed.
<>454
Date against which the entry has to be legally allocated.
<>118
Date/time at which the cargo booking has been accepted by the carrier.
<>594
Date of net worth.
<>392
Earliest date/time at which the equipment can be picked up.
<>190
Date and time of the transfer of the goods from one means of transport to another.
<>189
Date (and time) of scheduled departure of means of transport.
<>123
(2211) the latest date/time for presentation of the documents to the bank where the credit expires.
<>761
The date/time from which the minimum buying quantity may be purchased.
<>527
Estimated date of childbirth.
<>558
Date change takes place.
<>246
Year considered for accounting of the treaty or portion of the treaty.
<>365
The date on which the packaging of a product took place.
<>563
Date of initial placement.
<>202
The date when an entry is posted to an account.
<>321
Date/period relevant for specific promotion activities.
<>167
The charge period's first date.
<>725
The date of the onset of an illness similar to the illness currently being treated.
<>74
Delivery is requested to happen prior to or including the given date.
<>642
Date when the legal action was closed.
<>440
Date of amendment of a documentary credit.
<>459
Date when two persons are married.
<>83
The shortest interval allowed between one dispensing of an item and the next dispensing of the same item.
<>606
Date when operations ceased.
<>404
Date/time when the specified goods or transport equipment has or have been loaded in or on the means of transport.
<>377
The date on which container equipment is to be or has been inspected in accordance with the requirements of the u.s. federal highway administration.
<>276
Lead time is the defined timespan.
<>748
Code identifying the period during which something is, was or will be open.
<>298
Date/time at which goods can be picked up, according to a plan.
<>44
Date/time when received item is available.
<>470
The latest date or time for starting.
<>91
The date on which a report is to end.
<>636
Date when current authority took control.
<>19
Period of time between slaughter and delivery during which meat is ageing.
<>672
The period assigned.
<>434
Date at which maturity occurs.
<>469
The earliest date or time for starting.
<>571
Date when checked.
<>333
Date/time when the proportion of part-time work changes.
<>175
The information must be advised before the date/time indicated.
<>737
Earliest period for which a filing is made.
<>232
Date (and time) of scheduled arrival of means of transport.
<>308
Date/time on which the payment valuation is presented.
<>131
[2221] date on which tax is due or calculated.
<>773
The date and/or time when the end of the handling action is estimated to take place.
<>535
The date the product failed.
<>349
Date on which packing completed.
<>41
The expected duration of an event.
<>94
Date on which goods are produced.
<>475
The actual date or time for starting.
<>633
Date when legal structure was changed.
<>428
The original issue age.
<>677
The date and/or time on which the stuffing of transport equipment is to or has taken place.
<>431
Period for charging the additional extra.
<>58
Date on which customs formalities necessary to allow goods to be exported, to enter home use, or to be placed under another customs procedure has been accomplished (ccc).
<>574
Date when account was closed.
<>336
Date when a change in salary becomes effective.
<>170
More generic than 'payment due date' and therefore more apt for reinsurance/insurance business.
<>732
Date on which the highest credit was granted.
<>237
The date and/or time tank cleaning was completed.
<>699
Date when a registered contractor number was originally assigned.
<>709
Expected date and/or time of admission.
<>134
Date/time on which the exchange rate was fixed.
<>776
Date used at the discretion of the filer for duty calculation of non-quota goods when there is no immediate transport entry date (related to immediate delivery).
<>530
The date/or time on which fumigation is to occur or has taken place.
<>372
The date on which equipment is pre-tripped.
<>273
Dates (from/to)/period referenced documents are valid.
<>13
Date by which payment must be made.
<>661
The date on which assets were judged to be insufficient.
<>427
The adjusted age used for purposes of calculation.
<>678
The date and/or time on which the stripping of a transport equipment is to or has taken place.
<>57
The period when a precaution is relevant.
<>463
Date when a period of work ends.
<>625
Date of incorporation.
<>339
Date/time when a change of category is made.
<>238
The date and/or time the tanks are to be or have been accepted.
<>696
The latest date/time when financial accounts were filed at public registry.
<>494
To identify the period over which covered income is measured.
<>302
The date of the act of making something publicly known.
<>100
Period of time before delivery during which the product is ageing.
<>706
Date and, or time of file generation.
<>504
Date when a period of overtime begins.
<>779
Date and time on which the conveyance transporting the goods from the foreign country arrived within the limits of the port of destination.
<>265
The date on which some action should occur.
<>742
Date/time when financial information is submitted.
<>540
Original execution date for the instruction.
<>346
Latest time of check-in.
<>144
Date that the quota applies to.
<>221
Number of days used for the calculation of interests.
<>292
The date/time for the completion of building or repair operations is planned.
<>639
Period of peak activity.
<>16
Date/time when promotion activities end.
<>664
Number of time units added to the original end date/time/period.
<>422
The date the documentary credit has been issued.
<>52
Last date for accumulation of delivery quantities.
<>466
A time now date used for planning and scheduling purposes.
<>620
Date when detrimental information was received.
<>738
Date when the original name was changed.
<>693
Date when an entity was established or created.
<>491
Date when a period of selection ends.
<>307
Date/time on which a payment instruction was given.
<>105
Date/time on which delivering period for breakbulk storo cargo starts (storo = stowing on roll on-roll off vessel).
<>703
Period of time from notice to proceed until performance commencement.
<>501
Date of survey of equipment while in use.
<>260
Date when customs valuation was made.
<>378
The date on which container equipment is to be or has been inspected as per the container safety convention (csc).
<>279
Lead time is the defined timespan.
<>545
Date when assigned.
<>747
Code identifying the value date of cost accounting. value date is the date at which the entry is to effect a balance of the account.
<>343
Date/time when the deduction from an amount comes to an end.
<>141
[2033] presentation date of a declaration to customs.
<>224
Date on which permission was granted to move merchandise into a bonded warehouse or free trade zone.
<>297
Date/time on which the retention is partially released.
<>384
Indicates the date which was allocated to a previous invoice.
<>186
(2280) date (and time) of departure of means of transport.
<>780
The filing date that corresponds to the current status of the commodity in the free trade zone.
<>582
Date of an interview.
<>528
Date when the last menstrual cycle started.
<>755
Minimum period of time during which the product is ageing.
<>557
Date return takes place.
<>249
Date on which a cash call was made for a loss suffered and covered.
<>1
Actual date/time on which the service was completed.
<>250
Date of re-exportation.
<>351
Date of inspection.
<>153
The latest date/time on which cancellation of the payment order may be requested.
<>285
Date/time on which the invitation to tender has been made available to relevant parties.
<>168
The charge period's last date.
<>610
Date of registration in the court.
<>412
Date/time on which the container stripping should be completed at the latest.
<>62
Date excluded from a period of time.
<>654
The period of time in which income is earned.
<>456
Period covered by the chart of account.
<>681
A date/time/period within which an implementation is to take place.
<>483
The not after date or time for completion.
<>609
Date when a new authority took control.
<>214
Calculation is based on year of 365-6 days, month of 28- 31 days.
<>315
Date on which the debtor agreed to pay.
<>117
First possible date/time for delivery.
<>711
To identify the period of time for which benefits are provided in the event of an accident.
<>513
Date and or time when an accident occurred.
<>758
The earliest date/time that the trade item can be shipped.
<>244
The date for which settlement is planned.
<>367
Date on which the previous reading of a meter took place.
<>288
Base date/time of prices.
<>561
Date the business terminates.
<>200
Date/time at which the cargo is picked up. synonym: collected.
<>323
Period forming a (planning) horizon.
<>165
Date when a tax period begins.
<>727
The date something was previously placed.
<>76
The date/time for which delivery is scheduled.
<>640
Date when presented to the bankruptcy receivers.
<>442
Date the item was last returned from hire.
<>659
The period of time over which an adjournment is in effect.
<>81
Shipment should happen earliest at given date.
<>604
Date of capitalisation.
<>406
The date/time on which the goods will be positioned according to a planning.
<>219
Date/time at which goods are transferred across a country border.
<>318
The date on which something was asked for.
<>596
Period over which profit was earned.
<>390
Lead time to determine the delivery date based on the date an award is made.
<>192
Date on which validity of a customs document expires.
<>389
Specifies the length of time that an article was or should be cured.
<>121
Date of entry.
<>763
The date and or time suggested for the marketing campaign to start.
<>525
Date and or time of clinical examination.
<>566
Date when activity is scheduled to end.
<>207
Date/time on which the intake of materials to be carried to improve the trim and the stability of the means of transport, was commenced.
<>324
Date/period a specific process happened/will happen.
<>162
Date when the supplier released goods.
<>720
Date when initially treated for this condition.
<>418
The minimum shelf life remaining at the time of receipt.
<>71
Delivery is requested to happen after or on given date.
<>68
An interval of time added to a period of time.
<>647
Date when a trial is scheduled to begin.
<>445
The date of the original estimate.
<>35
Date/time on which goods or consignment are delivered at their destination.
<>489
Date when a period of benefit ends.
<>86
Date and/or time when medication was started.
<>603
Date of participation.
<>401
Date on which the validity of a container safety convention (csc) plate expires.
<>519
Date and or time when a period of care ends.
<>397
Date/time on which equipment should be positioned (delivered) at the latest.
<>195
[2273] date on which the validity of an import licence expires.
<>591
Date when recorded.
<>588
Date of an accountant's opinion.
<>126
[2327] date on which a contract is issued.
<>764
The start date of availability.
<>522
Actual date and or time of childbirth.
<>243
The date/time at which a document was transmitted.
<>360
The date by which a product should be sold.
<>159
The last date of a period forming a horizon.
<>47
Date for statistical time series purposes.
<>473
The mandatory date or time for starting.
<>92
Date when a contract becomes valid.
<>635
Date when not yet registered.
<>668
The date that the claim was incurred.
<>671
The date on which distribution is to stop.
<>437
The period of time for which benefits are provided.
<>572
The beginning date of residence at present location.
<>330
Date when a person joins an employer.
<>176
The advise has been completed at the date indicated.
<>734
The period of time a company can renew its duration period.
<>231
Date/time of earliest arrival of means of transport.
<>109
The date on which a financial institution, serving as collection agency for a company located in another part of the country, collects an amount of money on behalf of that company.
<>132
[2349] date and or time of the estimated arrival of means of transport.
<>770
The date and/or time until which a product is exclusive.
<>536
Date the item was or will be reviewed.
<>374
The date of expiry of the road fund tax.
<>275
Lead time is the defined timespan.
<>549
Date of completion.
<>228
Date on which the account owner wants the debit value to his account.
<>11
(2170) date/time on which the goods are or are expected to be despatched or shipped.
<>663
The beginning of a forecast period.
<>425
Date when the entry was originally posted.
<>55
Date/time which has been confirmed.
<>461
Date when a period of wage ends.
<>579
Date when an administrator is ordered for a company.
<>627
Date balance sheet was last checked to determine if update had taken place.
<>694
Latest period for which a filing may be made.
<>496
Identifies the date of reinstatement.
<>300
Limit value date of indexes used as numerators in a price adjustment formula.
<>102
Period of time of health problem.
<>704
Period of time from date of notice to proceed until completion.
<>506
The date/time/period during which the delivery of a back order will take, or has taken, place.
<>139
The date the mortgage on a piece of property begins.
<>267
Date/time on which a rate/price is determined.
<>740
Date education is completed at an educational institution.
<>542
Date when material was last published.
<>344
Date/time when the interest has to be paid.
<>146
Date on which the official date of customs entry is anticipated.
<>223
New date and time of delivery calculated on basis of a consignee's requirement (chargeable).
<>290
Date/time on which activities stated in the contract must start.
<>478
The scheduled date or time for starting.
<>99
The date on which the quotation has been or may be opened.
<>666
Date when management is available.
<>420
To report the date and time that an unloading action occurred.
<>439
The period of time for which an activity has been postponed.
<>50
Date/time upon which the goods were received by a given party.
<>464
Date and time at which crew and/or passengers board.
<>622
Date of the financial information.
<>178
[2107] date and or time of the arrival of means of transport.
<>691
Date of advice.
<>493
To identify the date on which benefit payments have ceased.
<>305
Date on which the latest price adjustment took place.
<>107
The date/time on which a deposit was made.
<>701
Original length of time.
<>503
Date of production inspection.
<>538
Date the data maintenance request (dmr) was approved for publication after completing international review.
<>262
Date/time/period when an enterprise is closed.
<>745
Date/time when a payment is recorded as being impossible.
<>547
Date when the initial financial accounts were filed.
<>341
The period of time between the moment at which one wants an activity to begin and the moment at which this activity can actually begin.
<>143
[2127] actual date and optionally time when a consignment of goods is taken over by the carrier at the place of acceptance.
<>226
Date/time at which a discrepancy has been found.
<>295
Date/time on which hand over (i.e. the transfer of responsibility for an object or activity such as documentation, system etc. from one party to another) actually takes place.
<>49
Deliver not before and not after a specific date range.
<>14
Date/time when instalments are due.
<>7
(2069) date and/or time at which specified event or document becomes effective.
<>256
Lead time to determine the completion date of an effort based on the date an award is made.
<>357
Cancel if not published by this date.
<>155
The first date of an accounting period.
<>283
Lead time is referenced to the date a transport will arrive or has arrived.
<>328
Date/time of a monetary deduction made from the salary of a person on a payroll.
<>20
Date/time when cheque is issued.
<>616
Date when accounting methodology was changed.
<>414
Date/time on which equipment has been ascertained as being in stock.
<>64
Date identifying a point in time before which the goods shall not be delivered.
<>449
Date for the last update.
<>652
The ending date of a period in which employees were temporarily placed out of work.
<>450
Date of opening.
<>39
Date identifying the week during which goods should be shipped.
<>687
A date on which an object is ready for collection.
<>485
Date when a period of illness began.
<>212
Calculation is based on year of 360 days, month of 28-31 days.
<>313
Issue date of an instruction to start work.
<>111
The date of issuance of a manifest or ship notice.
<>717
To identify the period of time the insured must be disabled in the event of an accident for benefits to be payable by the ceding company.
<>515
Date and or time when a reimbursement claim is issued.
<>199
The date and/or time the goods have to be or have been positioned.
<>382
The earliest date on which the product may be made available for sale.
<>180
Final date for delivering cargo to a liner ship.
<>786
The year that the crops were grown.
<>584
Period in the future.
<>768
The date and/or time until which the maximum buying quantity may be purchased.
<>753
Date at which optimal maturity occurs.
<>551
End date of the lease term.
<>729
The date a temporary prosthetic device was provided.
<>613
Date when the annual report was mailed.
<>411
Date/time on which the container stuffing should be completed at the latest.
<>78
The actual date/time/period an event occurred.
<>61
The date on which cancellation should take place, if delivery has not occurred.
<>657
The period of time over which receivable accounts are collected.
<>455
Date on which the funds are expected to be at the disposal of the beneficiary.
<>682
The period within which a refusal can be made.
<>480
The not before date or time for starting.
<>408
Estimated date and time when the containers are expected to go on-hire.
<>217
Lead time to determine the latest date a delivery can be made based on the date an award is made.
<>316
Date/time of valuation.
<>114
Date as of a tool has to be available customer defined.
<>712
To identify the age to which benefits are provided to the insured in the event of an accident.
<>510
The time limit which has been set for a notification to take place.
<>598
Date when consolidation occurred.
<>387
Provides the period of time necessary to turnaround a given repair.
<>185
The date/and or time tank cleaning was started.
<>783
Date/time at which an inspection is completed.
<>581
Date when convicted.
<>756
Ultimate date/time by which the documentation must be submitted in compliance with the 4-hour rule of united states custom of border protection.
<>554
Date when filed.
<>2
Date on which buyer requests goods to be delivered.
<>369
The date and or time when the handling action is estimated to take place.
<>253
Date/time that conveyance departed from the last foreign port of call.
<>352
Date on which slaughtering completed.
<>150
Date when item has been or has to be declared/presented.
<>286
Date/time on which the tender was submitted.
<>618
Date business was converted into a holding company.
<>73
The period for which the guarantee is or will be granted.
<>645
Date when sole directorship was registered.
<>447
Date on which the creditor requests to be credited.
<>37
Goods should not be shipped before given date/time.
<>689
Shipping date and/or time as currently scheduled.
<>84
Shipment should take place latest at given date.
<>601
As of this date the manager is not registered.
<>403
Date/time when the specified goods or transport equipment has or have been discharged from the means of transport.
<>719
Date when the provider signed.
<>395
Date/time on which equipment is estimated to be positioned (delivered).
<>197
First of a number of days allowed in a charter party of the loading and discharging of cargo.
<>593
Date of the last annual report.
<>788
The model year of the item.
<>124
[2219] issue date of a despatch note.
<>766
Minimum time required between order entry and goods release for pick-up.
<>520
Date and or time of admission to a department.
<>241
Lead time to determine the earliest date a delivery can be made based on the date an award is made.
<>9
Date/time of processing.
<>362
The end date of availability.
<>258
Date when a guarantee is placed.
<>359
Scheduled for delivery on or before specified date and or time.
<>564
Date of signature.
<>205
Date for settlement of financial transaction e.g. foreign exchange securities.
<>326
Period a specified charge is valid for.
<>160
Date when an authorization was given.
<>722
Date when a benefit is authorized for release.
<>673
The period associated with a lease.
<>435
The actual or equivalent age at time of issue.
<>468
To specify a non working date or period.
<>570
Date when reported.
<>332
Date/time when a contribution period ends.
<>174
The information must be advised after the date/time indicated.
<>736
Date when an appointment will expire.
<>233
Date (and time) of ultimate arrival of means of transport.
<>309
Date on which the funds are at the disposal of the receiving bank or cease to be at the disposal of the sending bank.
<>130
Date of the current report.
<>772
The actual date and/or time when the start of the handling action takes place.
<>534
The date of a repair or service.
<>376
The date on which a biannual inspection of a terminal has taken or will take place.
<>277
Lead time is the defined timespan.
<>749
Interval of time between the date when the transaction was initiated and the date when the funds need to be collected.
<>299
Value date of the indexes appearing as denominators in a price adjustment formula.
<>ZZZ
A code assigned within a code list to be used on an interim basis and as defined among trading partners until a precise code can be assigned to the code list.
<>45
Date and time of the compilation.
<>471
The earliest date or time for finishing.
<>90
The date on which a report is to begin.
<>637
Date when privilege details were verified.
<>18
The date/time/period of the act, or an instance of installing something or someone.
<>674
The ending date of a forecast period.
<>432
Date to which payments have been paid.
<>577
Date of next review.
<>629
Date of a letter of agreement.
<>335
Date/time when a contribution period commences.
<>173
Date until which an item has been or will be hired.
<>731
The period of orthodontic treatment from beginning to end.
<>234
The transport order may be issued before the goods are ready for picking up. this date/time indicates from when on the carrier can have access to the consignment.
<>498
Identifies the date of the previous termination.
<>508
The date on which work will effectively start.
<>137
[2007] date that a document was issued and when appropriate, signed or otherwise authenticated.
<>775
The minimum life span of the product remaining after selling it to the consumer, i.e. between the "sell by date" and the "use by date" of the product.
<>533
The date on which something has been applied to a budget line.
<>269
Date/time when discharge operations were started.
<>371
The date equipment has been hydrotested.
<>270
The date identifying the period during or in which the goods should be shipped.
<>148
[2037] date on which a goods declaration has been or will be accepted by customs in accordance with customs legislation.
<>42
Date/time being overlaid by a date given elsewhere.
<>97
The date on which a transaction was originated or brought into being.
<>476
The estimated date or time for starting.
<>630
Date of a letter of liability.
<>462
Date when a period of work begins.
<>624
Date when insolvency discharge was granted.
<>338
Date/time when a benefit provided by a service provider is changed.
<>239
The date and/or time the tanks are to be or have been inspected.
<>697
Date when placed in a disfavoured category or status.
<>495
To identify the period over which current income is measured.
<>303
Value date of indexes appearing as numerators in an escalation formula.
<>101
Date as of there is no valid production schedule.
<>707
Date on which a certificate, endorsed by signature or other agreed means, is issued.
<>505
Date when a period of overtime ends.
<>778
The date and time of conveyance activity, including cargo loading or unloading, fuelling etc.
<>264
Frequency of a release.
<>743
Date identifying a point of time after which a purchase order cannot be changed.
<>541
Date when material was first published.
<>347
Date on which slaughtering commenced.
<>145
A date specifying an event.
<>220
The date the mortgage on a piece of property is scheduled to end.
<>293
The actual date/time for the completion of building or repair operations.
<>12
Date by which payment should be made if discount terms are to apply.
<>660
The date on which a court refused further hearing of a case.
<>426
The frequency of payments of reinsurance premiums.
<>679
Date of an initial request.
<>56
Date and/or time when original authorisation was issued.
<>209
Date on which the funds are at the disposal of the beneficiary or cease to be at the disposal of the ordering customer.
<>22
Date/time when freight bill is issued.
<>614
Date when the annual report was filed.
<>416
The date of a submission.
<>66
An interval of time excluded from a period of time.
<>649
Date when the value added tax (vat) claims were verified.
<>650
Date when the result of the receivership occurs.
<>452
Period covered by the trial balance.
<>685
The first date, and/or time, and/or period a product was sold.
<>487
Date when a person died.
<>88
Date/time at which the summer time starts.
<>210
The date of the current reinsurance account.
<>311
Fixed maturity day for deferred payment or time draft(s).
<>113
Date as of a sample has to be available customer defined.
<>715
To identify the age to which benefits are provided to the insured in the event of sickness.
<>517
Date and or time of discharge from a hospital.
<>399
Date/time on which goods are expected to be positioned.
<>380
Date the drawing revision has been allocated to a design.
<>182
Date when a document/message has been or will be issued.
<>784
Date/time at which the document/message was rejected.
<>586
Date when problem is expected to be resolved.
<>128
Date when the last delivery should be or has been accomplished.
<>751
The specified after date.
<>553
Date of estimated start.
<>5
A period of time when saleable stocks are expected to cover demand for a product.
<>254
Registration date of the customs declaration for the previous customs procedure either in the same or another country.
<>355
The date of delivery contractually agreed between parties.
<>157
The first date of a period for which something is valid.
<>281
Lead time is referenced to the date of order.
<>568
Date of suspension.
<>611
Date when annual report is due.
<>413
Date/time when all discharge and loading operations on the transport means have been completed.
<>63
[2025] last date, and optionally time of a delivery.
<>655
The period of time over which a criminal sentence applies.
<>457
Date of marital separation.
<>680
The period by which an event is overdue.
<>482
The not before date or time for completion.
<>608
Date when terms specified in the legal settlement were met.
<>215
Calculation is based on year of 365 days, month of 28-31 days.
<>314
The period of time planned for the completion of building or repair operations.
<>116
Period until which equipment is expected to be hired.
<>710
Date and/or time of onset of symptoms according to the patient.
<>512
Date and or time and or period of attendance.
<>385
Date/time when a payment is cancelled due to the fact that the transaction does not comply with the agreement.
<>187
Date/time when the document is signed or otherwise authenticated.
<>781
Actual date/time at which the conveyance or goods enter an agency's jurisdiction.
<>583
Date of last visit.
<>529
Actual duration of pregnancy.
<>754
Maximum period of time during which the product is ageing.
<>556
Date of purchase.
<>248
Date, time, period on which a referenced loss occurred.
<>251
Date of re-importation.
<>350
Date when a test has been started.
<>152
Date when imported textiles last left the country of origin for the country of importation.
<>284
Lead time is the defined timespan.
<>169
Time required between order entry till earliest goods delivery.
<>75
Delivery might take place latest at given date.
<>643
Date mail was received.
<>441
Date the item was last placed on hire.
<>458
Date when two married persons are officially divorced.
<>82
Designated time of day for the administration of medicine.
<>607
Date when satisfaction was obtained.
<>405
Date/time on which the equipment was actually collected.
<>119
Date when a test has been completed.
<>595
Date/time when a cancellation of a payment is rejected due to the fact that the payment is already done.
<>393
Date/time at which equipment can be picked up, either full or empty, according to a plan.
<>191
Date/time on which goods are expected to be delivered.
<>188
Date of the previous current account.
<>122
The date a contract is completed.
<>760
The date/time from which the maximum buying quantity may be purchased.
<>526
Date and or time of death.
<>559
Date termination takes place.
<>247
Year in which a specific event (e.g. a loss) took place.
<>364
Period indicating the minimum shelf life remaining for a product at the time of leaving the supplier.
<>562
Date when an entity is released from bankruptcy status.
<>203
The date/time on which the ordered bank is requested to initiate the payment order, as specified by the originator (e.g. the date of the debit).
<>320
Reference period of a set of items reported on the same declaration.
<>166
Date when a tax period ends.
<>724
The date the symptoms manifested themselves in an acute form.